ITAC Assessment: UL2215
ITAC logo
ITAC Assessment: UL2215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Pharmaceutical Distribution
NAICS 424210: Drugs and Druggists' Sundries Merchant Wholesalers
SIC 5122: Drugs, Drug Proprietaries, and Druggists' Sundries
Sales Range less than $500
k
# of Employees 30
Plant Area 168,000
ft2
Annual Production 12,200,000
units
Production Hrs. Annual 8,568
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,289 1,876,441
kWh
Electricity Demand $184,073 7,138
kW-mo/yr
Electricity Fees $36,125 -
Natural Gas $86,447 7,791
MMBtu
TOTAL YEARLY COSTS $395,934
RECOMMENDED SAVINGS* $186,063 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,172

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,172 $939 $370
7,779
kWh
$802
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $8,205 - $2,660
55,385
kWh
$5,545
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $2,134 $521 $2,134
44,462
kWh
- - -
04 2.7135: Install occupancy sensors $6,981 - $6,981
145,444
kWh
- - -
05 2.3212: Optimize plant power factor $7,332 $3,015 - - $7,332 -
06 2.9112: Use solar heat to heat water $42,764 $150,000 - - - $42,764
-
MMBtu
07 2.9114: Use solar heat to make electricty $11,272 $137,883 $5,283
110,069
kWh
$5,989
-
kW-mo/yr
- -
08 2.9114: Use solar heat to make electricty $106,203 $818,801 $51,413
1,071,114
kWh
$54,790
-
kW-mo/yr
- -
TOTAL RECOMMENDED $186,063 $1,111,159 $68,841
1,434,253
kWh
$67,126
-
kW-mo/yr
$7,332 $42,764
-
MMBtu
TOTAL IMPLEMENTED $1,172 $939 $370
7,779
kWh
$802
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs