ITAC Assessment: OR0748
ITAC logo
ITAC Assessment: OR0748
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Aggregate Industry Equipment
NAICS 333120: Construction Machinery Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 180,000
ft2
Annual Production 310
units
Production Hrs. Annual 5,916
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,522 2,614,097
kWh
Electricity Demand $41,954 7,221
kW-mo/yr
Electricity Fees $5,225 -
Natural Gas $28,109 4,432
MMBtu
LPG $47,231 1,471
MMBtu
TOTAL YEARLY COSTS $312,041
RECOMMENDED SAVINGS* $146,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $146,969

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4239: Eliminate or reduce compressed air usage $6,763 $1,880 $2,576
35,531
kWh
$4,187
-
kW-mo/yr
- - - - - - -
02 3.5111: Filter and reuse hydraulic oil $34,830 $88,699 - - - - - $31,784
-
gal
- $3,000 $46
-
Tgal
03 2.3212: Optimize plant power factor $3,913 $10,533 - - $3,913 - - - - - -
04 2.8227: Adjust / maintain fork lift trucks for most efficient operation $99,431 $292,453 $(-7,204.0)
(-99,372)
kWh
- - - $47,231
-
MMBtu
- $59,404 - -
05 2.2511: Insulate bare equipment $2,032 $9,520 - - - $2,032
-
MMBtu
- - - - -
TOTAL RECOMMENDED $146,969 $403,085 $(-4,628.0)
(-63,841)
kWh
$4,187
-
kW-mo/yr
$3,913 $2,032
-
MMBtu
$47,231
-
MMBtu
$31,784
-
gal
$59,404 $3,000 $46
-
Tgal
TOTAL IMPLEMENTED $146,969 $403,085 $(-4,628.0)
(-63,841)
kWh
$4,187
-
kW-mo/yr
$3,913 $2,032
-
MMBtu
$47,231
-
MMBtu
$31,784
-
gal
$59,404 $3,000 $46
-
Tgal
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs