ITAC Assessment: BD0258
ITAC logo
ITAC Assessment: BD0258
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product PVC Plastic Dip & Injection Molded Products
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 85
Plant Area 85,000
ft2
Annual Production 400,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,977 1,471,050
kWh
Electricity Demand $9,386 4,392
kW-mo/yr
Natural Gas $49,008 6,928
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $2,506 $2,025 $2,048
41,117
kWh
$458
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $953 $2,175 $1,082
21,779
kWh
$37
-
kW-mo/yr
$(-166.0) - -
03 2.4133: Use most efficient type of electric motors $952 $1,280 $928
18,645
kWh
$24
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $611 $600 $544
10,924
kWh
$67
-
kW-mo/yr
- - -
05 2.7111: Reduce illumination to minimum necessary levels $575 $24 $440
7,570
kWh
$36
-
kW-mo/yr
$6 - $93
06 2.7144: Install spectral reflectors / delamp $271 $335 $166
3,329
kWh
$10
-
kW-mo/yr
$15 - $80
07 3.1162: Use less wasteful packaging $1,672 $180 - - - $1,672 -
TOTAL RECOMMENDED $7,540 $6,619 $5,208
103,364
kWh
$632
-
kW-mo/yr
$(-145.0) $1,672 $173
TOTAL IMPLEMENTED $5,293 $6,415 $4,768
95,794
kWh
$596
-
kW-mo/yr
$(-151.0) - $80
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs