ITAC Assessment: BD0251
ITAC logo
ITAC Assessment: BD0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Flexible Packaging
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 100,000
ft2
Annual Production 25,413,200
lb
Production Hrs. Annual 6,000
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,861 8,134,200
kWh
Electricity Demand $223,928 19,419
kW-mo/yr
Electricity Fees $23,017 -
Natural Gas $344,475 40,621
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $132,513 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $32,333 $98,853 n/a - - $32,333
-
MMBtu
- - -
02 2.4131: Size electric motors for peak operating efficiency $8,924 $8,924 $5,701
186,923
kWh
$3,223
-
kW-mo/yr
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $7,487 $850 $4,782
156,710
kWh
$2,705
-
kW-mo/yr
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $7,149 $945 $2,977
97,635
kWh
$3,996
-
kW-mo/yr
- - $11 $165
05 2.2437: Recover waste heat from equipment $4,899 $750 - - $4,899
-
MMBtu
- - -
06 2.2511: Insulate bare equipment $4,625 $413 $2,637
86,460
kWh
$1,988
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,870 $10,160 n/a $2,207
72,360
kWh
$1,663
-
kW-mo/yr
- - - -
08 2.4221: Install compressor air intakes in coolest locations $2,779 $2,000 $1,585
51,936
kWh
$1,194
-
kW-mo/yr
- - - -
09 2.4314: Use synthetic lubricant $2,224 $1,200 $1,269
41,625
kWh
$955
-
kW-mo/yr
- - - -
10 2.7111: Reduce illumination to minimum necessary levels $2,106 $3,570 $1,230
40,320
kWh
$926
-
kW-mo/yr
- - $(-8.0) $(-42.0)
11 2.7135: Install occupancy sensors $1,202 $2,670 $806
26,316
kWh
$377
-
kW-mo/yr
- - - $19
12 2.7135: Install occupancy sensors $1,199 $2,100 $379
12,428
kWh
$820
-
kW-mo/yr
- - - -
13 2.7134: Use photocell controls $767 $650 $423
13,874
kWh
$274
-
kW-mo/yr
- - $6 $64
14 3.5315: Lease / purchase baler; sell cardboard to recycler $52,949 $8,000 - - - $52,949
-
lb
- -
TOTAL RECOMMENDED $132,513 $141,085 $23,996
786,587
kWh
$18,121
-
kW-mo/yr
$37,232
-
MMBtu
$52,949
-
lb
$9 $206
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs