ITAC Assessment: BD0247
ITAC logo
ITAC Assessment: BD0247
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Extruded Plastic Sheet and Roll Stock
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 103
Plant Area 93,000
ft2
Annual Production 26,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,189 12,691,636
kWh
Electricity Demand $232,178 22,298
kW-mo/yr
Natural Gas $31,490 3,764
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $156,891 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $112,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.3137: Use power during off-peak periods $43,745 $2,000 $14,529
825,503
kWh
$29,216
-
kW-mo/yr
- - - - -
02 2.2437: Recover waste heat from equipment $13,627 $1,000 - - $13,627
-
MMBtu
- - - -
03 2.2511: Insulate bare equipment $13,156 $8,080 $13,156
748,212
kWh
- - - - - -
04 2.4133: Use most efficient type of electric motors $8,345 $35,510 $5,192
295,070
kWh
$3,153
-
kW-mo/yr
- - - - -
05 2.7231: Use radiant heater for spot heating $7,407 $8,000 - - $7,407
-
MMBtu
- - - -
06 2.7134: Use photocell controls $5,082 $1,500 $1,307
74,222
kWh
$3,158
-
kW-mo/yr
- - $142 $475 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $3,389 $9,225 $2,546
144,671
kWh
$792
-
kW-mo/yr
- - $51 - -
08 2.4314: Use synthetic lubricant $2,306 $500 $1,274
72,362
kWh
$1,032
-
kW-mo/yr
- - - - -
09 2.7135: Install occupancy sensors $1,611 $4,125 $475
27,195
kWh
$1,136
-
kW-mo/yr
- - - - -
10 2.7111: Reduce illumination to minimum necessary levels $1,343 $240 $324
18,382
kWh
$919
-
kW-mo/yr
- - $40 $60 -
11 2.4221: Install compressor air intakes in coolest locations $606 $500 $335
19,012
kWh
$271
-
kW-mo/yr
- - - - -
12 2.4231: Reduce the pressure of compressed air to the minimum required $235 - $130
7,402
kWh
$105
-
kW-mo/yr
- - - - -
13 3.5316: Contract a wood pallet recycling company $8,829 $336 - - - $8,829
-
lb
- - -
14 3.5217: Reuse / recycle/ sell paper products $1,890 $240 - - - $1,890
-
lb
- - -
15 4.322: Eliminate old stock and modify inventory control $34,400 $10,000 - - - - - - $34,400
16 4.111: Add equipment/ operators to reduce production bottleneck $10,920 $5,000 - - - - $10,920 - -
TOTAL RECOMMENDED $156,891 $86,256 $39,268
2,232,031
kWh
$39,782
-
kW-mo/yr
$21,034
-
MMBtu
$10,719
-
lb
$11,153 $535 $34,400
TOTAL IMPLEMENTED $112,911 $84,256 $24,609
1,399,126
kWh
$10,461
-
kW-mo/yr
$21,034
-
MMBtu
$10,719
-
lb
$11,153 $535 $34,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs