Assessment Year | 1995 |
---|---|
Principal Product | Aluminum die castings |
NAICS |
n/a
|
SIC | 3363: Aluminum Die-Castings |
Sales Range | $10 M to 50M |
# of Employees | 425 |
Plant Area |
142,000
ft2
|
Annual Production | 12,000,000
lb
|
Production Hrs. Annual | 6,696
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $365,653 | 6,837,632 |
kWh
|
$0.053 |
Natural Gas | $226,957 | 77,212 |
MMBtu
|
$2.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $131,810 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,910 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $12,350 | $580 | - |
$12,350
-
MMBtu
|
- | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,560 | $750 |
$5,560
213,951
kWh
|
- | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,340 | $60 |
$1,340
27,550
kWh
|
- | - | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,560 | $240 |
$1,560
30,774
kWh
|
- | - | - | - | |
05 | 2.4314: Use synthetic lubricant | $1,220 | - |
$1,220
24,912
kWh
|
- | - | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,140 | $3,300 |
$1,140
23,740
kWh
|
- | - | - | - | |
07 | 2.7145: Install skylights | $500 | $1,250 |
$500
19,637
kWh
|
- | - | - | - | |
08 | 2.7145: Install skylights | $300 | $1,200 |
$300
11,430
kWh
|
- | - | - | - | |
09 | 3.1172: Revise raw material specs | $82,700 | $30,200 | - | - | - |
$82,700
-
gal
|
- | |
10 | 3.4154: Eliminate leaks in water lines and valves | $17,300 | - | - | - |
$17,300
-
Tgal
|
- | - | |
11 | 3.3122: Use filtration, centrifuging to remove contaminants | $7,840 | $1,200 | - | - | - | - |
$7,840
-
lb
|
|
TOTAL RECOMMENDED | $131,810 | $38,780 |
$11,620
351,994
kWh
|
$12,350
-
MMBtu
|
$17,300
-
Tgal
|
$82,700
-
gal
|
$7,840
-
lb
|
||
TOTAL IMPLEMENTED | $45,910 | $3,790 |
$8,420
277,843
kWh
|
$12,350
-
MMBtu
|
$17,300
-
Tgal
|
- |
$7,840
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs