Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product ABS and PVC extruded plastic sheet and ABS laminated sheet
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 225,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $805,232 18,216,000
kWh
Electricity Demand $406,307 41,698
kW-mo/yr
Natural Gas $377,408 63,695
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $178,043 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,283

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7231: Use radiant heater for spot heating $53,446 $65,000 - - $53,446
-
MMBtu
- - - -
02 2.1224: Replace boiler $47,120 $17,500 n/a - - $47,120
-
MMBtu
- - - -
03 2.4133: Use most efficient type of electric motors $24,869 $39,515 $16,594
375,435
kWh
$8,275
-
kW-mo/yr
- - - - -
04 2.7135: Install occupancy sensors $6,404 $2,550 $4,315
97,622
kWh
$2,089
-
kW-mo/yr
- - - - -
05 2.1133: Adjust burners for efficient operation $6,257 $2,400 - - $6,257
-
MMBtu
- - - -
06 2.1213: Direct warmest air to combustion intake $5,959 $4,000 $(-516.0)
(-11,680)
kWh
$(-117.0)
-
kW-mo/yr
$6,592
-
MMBtu
- - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,054 $400 $3,550
80,300
kWh
$1,504
-
kW-mo/yr
- - - - -
08 2.4221: Install compressor air intakes in coolest locations $3,789 $750 $2,661
60,197
kWh
$1,128
-
kW-mo/yr
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2,912 $4,200 $2,091
47,299
kWh
$696
-
kW-mo/yr
- - $125 - -
10 2.4314: Use synthetic lubricant $2,560 $1,500 $1,798
40,680
kWh
$762
-
kW-mo/yr
- - - - -
11 2.7111: Reduce illumination to minimum necessary levels $2,489 $345 $1,484
33,571
kWh
$628
-
kW-mo/yr
- - $34 $343 -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $1,086 $975 $486
10,985
kWh
$146
-
kW-mo/yr
- - $190 $264 -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $967 $2,500 $463
10,483
kWh
$201
-
kW-mo/yr
- - $61 $242 -
14 2.1222: Install turbulators $686 $1,500 - - $686
-
MMBtu
- - - -
15 3.5316: Contract a wood pallet recycling company $3,400 $500 - - - $3,400
-
lb
- - -
16 3.5248: Separate and recycle scrap metal to foundry or for sale $2,400 $500 - - - $2,400
-
lb
- - -
17 4.821: Pay bills on time to avoid late fees $7,293 - - - - - - - $7,293
18 4.447: Automate payroll system $1,352 $2,500 - - - - $1,352 - -
TOTAL RECOMMENDED $178,043 $146,635 $32,926
744,892
kWh
$15,312
-
kW-mo/yr
$114,101
-
MMBtu
$5,800
-
lb
$1,762 $849 $7,293
TOTAL IMPLEMENTED $28,283 $10,500 $6,104
138,082
kWh
$2,401
-
kW-mo/yr
$6,257
-
MMBtu
$5,800
-
lb
$186 $242 $7,293
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs