Assessment Year | 2003 |
---|---|
Principal Product | Steel forgings |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
122,000
ft2
|
Annual Production | 19,000,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $338,405 | 8,441,927 |
kWh
|
$0.040 |
Electricity Demand | $165,939 | 37,606 |
kW-mo/yr
|
$4.41 |
Electricity Fees | $18,651 | - |
|
- |
Natural Gas | $129,418 | 40,417 |
MMBtu
|
$3.20 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $185,971 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $32,297 | $56,000 | - | - |
$32,297
-
MMBtu
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $8,921 | $5,000 | - | - |
$8,921
-
MMBtu
|
- | - | |
03 | 2.4314: Use synthetic lubricant | $4,857 | $2,000 |
$3,687
91,946
kWh
|
$1,170
-
kW-mo/yr
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,331 | - |
$3,286
82,195
kWh
|
$1,045
-
kW-mo/yr
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $1,365 | $1,275 |
$877
21,870
kWh
|
$488
-
kW-mo/yr
|
- | - | - | |
06 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $62,620 | $10,000 | - |
$162,620
-
kW-mo/yr
|
- | $(-100,000.0) | - | |
07 | 4.445: Install equipment to move product | $39,936 | $45,000 | - | - | - | $39,936 | - | |
08 | 4.447: Automate payroll system | $16,965 | $7,000 | - | - | - | $16,965 | - | |
09 | 4.445: Install equipment to move product | $12,480 | $25,000 | - | - | - | $12,480 | - | |
10 | 4.821: Pay bills on time to avoid late fees | $2,199 | - | - | - | - | - | $2,199 | |
TOTAL RECOMMENDED | $185,971 | $151,275 |
$7,850
196,011
kWh
|
$165,323
-
kW-mo/yr
|
$41,218
-
MMBtu
|
$(-30,619.0) | $2,199 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs