ITAC Assessment: BD0237
ITAC logo
ITAC Assessment: BD0237
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Steel forgings
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 122,000
ft2
Annual Production 19,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $338,405 8,441,927
kWh
Electricity Demand $165,939 37,606
kW-mo/yr
Electricity Fees $18,651 -
Natural Gas $129,418 40,417
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $185,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.7231: Use radiant heater for spot heating $32,297 $56,000 - - $32,297
-
MMBtu
- -
02 2.2437: Recover waste heat from equipment $8,921 $5,000 - - $8,921
-
MMBtu
- -
03 2.4314: Use synthetic lubricant $4,857 $2,000 $3,687
91,946
kWh
$1,170
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,331 - $3,286
82,195
kWh
$1,045
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $1,365 $1,275 $877
21,870
kWh
$488
-
kW-mo/yr
- - -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $62,620 $10,000 - $162,620
-
kW-mo/yr
- $(-100,000.0) -
07 4.445: Install equipment to move product $39,936 $45,000 - - - $39,936 -
08 4.447: Automate payroll system $16,965 $7,000 - - - $16,965 -
09 4.445: Install equipment to move product $12,480 $25,000 - - - $12,480 -
10 4.821: Pay bills on time to avoid late fees $2,199 - - - - - $2,199
TOTAL RECOMMENDED $185,971 $151,275 $7,850
196,011
kWh
$165,323
-
kW-mo/yr
$41,218
-
MMBtu
$(-30,619.0) $2,199
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs