Assessment Year 2003
Principal Product Croissants and Bread
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 65,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 3,640
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,757 2,053,384
kWh
Electricity Demand $53,852 4,400
kW-mo/yr
Electricity Fees $1,471 -
Natural Gas $16,800 11,407
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,287 $19,803 $4,233
85,350
kWh
$3,445
-
kW-mo/yr
- $435 $2,174 -
02 2.7135: Install occupancy sensors $1,278 $1,650 $463
9,292
kWh
$692
-
kW-mo/yr
- $37 $86 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,296 $825 $510
10,291
kWh
$173
-
kW-mo/yr
- $253 $360 -
04 2.4221: Install compressor air intakes in coolest locations $645 $500 $311
8,277
kWh
$334
-
kW-mo/yr
- - - -
05 2.4133: Use most efficient type of electric motors $641 $1,240 $396
7,988
kWh
$245
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $557 - $307
6,197
kWh
$250
-
kW-mo/yr
- - - -
07 2.7111: Reduce illumination to minimum necessary levels $489 $150 $235
4,739
kWh
$183
-
kW-mo/yr
- $11 $60 -
08 2.2511: Insulate bare equipment $473 $1,160 - - $473
-
MMBtu
- - -
09 3.5316: Contract a wood pallet recycling company $300 $500 - - - - $300 -
10 4.821: Pay bills on time to avoid late fees $1,471 - - - - - - $1,471
11 3.5316: Contract a wood pallet recycling company $250 $500 - - - - $250 -
TOTAL RECOMMENDED $17,687 $26,328 $6,455
132,134
kWh
$5,322
-
kW-mo/yr
$473
-
MMBtu
$736 $3,230 $1,471
TOTAL IMPLEMENTED $2,814 $3,890 $1,170
25,557
kWh
$1,271
-
kW-mo/yr
- $37 $336 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings