Assessment Year | 2003 |
---|---|
Principal Product | Croissants and Bread |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
65,000
ft2
|
Annual Production | 5,000,000
lb
|
Production Hrs. Annual | 3,640
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $101,757 | 2,053,384 |
kWh
|
$0.050 |
Electricity Demand | $53,852 | 4,400 |
kW-mo/yr
|
$12.24 |
Electricity Fees | $1,471 | - |
|
- |
Natural Gas | $16,800 | 11,407 |
MMBtu
|
$1.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,687 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,814 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,287 | $19,803 |
$4,233
85,350
kWh
|
$3,445
-
kW-mo/yr
|
- | $435 | $2,174 | - | |
02 | 2.7135: Install occupancy sensors | $1,278 | $1,650 |
$463
9,292
kWh
|
$692
-
kW-mo/yr
|
- | $37 | $86 | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,296 | $825 |
$510
10,291
kWh
|
$173
-
kW-mo/yr
|
- | $253 | $360 | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $645 | $500 |
$311
8,277
kWh
|
$334
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $641 | $1,240 |
$396
7,988
kWh
|
$245
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $557 | - |
$307
6,197
kWh
|
$250
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.7111: Reduce illumination to minimum necessary levels | $489 | $150 |
$235
4,739
kWh
|
$183
-
kW-mo/yr
|
- | $11 | $60 | - | |
08 | 2.2511: Insulate bare equipment | $473 | $1,160 | - | - |
$473
-
MMBtu
|
- | - | - | |
09 | 3.5316: Contract a wood pallet recycling company | $300 | $500 | - | - | - | - | $300 | - | |
10 | 4.821: Pay bills on time to avoid late fees | $1,471 | - | - | - | - | - | - | $1,471 | |
11 | 3.5316: Contract a wood pallet recycling company | $250 | $500 | - | - | - | - | $250 | - | |
TOTAL RECOMMENDED | $17,687 | $26,328 |
$6,455
132,134
kWh
|
$5,322
-
kW-mo/yr
|
$473
-
MMBtu
|
$736 | $3,230 | $1,471 | ||
TOTAL IMPLEMENTED | $2,814 | $3,890 |
$1,170
25,557
kWh
|
$1,271
-
kW-mo/yr
|
- | $37 | $336 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs