ITAC Assessment: BD0228
ITAC logo
ITAC Assessment: BD0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Automative Components
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 60,000
ft2
Annual Production 1,275,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,777 2,802,528
kWh
Electricity Demand $60,011 5,955
kW-mo/yr
Electricity Fees $1,279 -
Natural Gas $8,985 1,327
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,906

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.2437: Recover waste heat from equipment $5,709 $1,500 - - $5,709
-
MMBtu
- - - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,906 $1,300 $2,704
74,488
kWh
$1,202
-
kW-mo/yr
- - - - - -
03 2.7135: Install occupancy sensors $3,014 $900 $2,187
60,288
kWh
$827
-
kW-mo/yr
- - - - - -
04 2.7231: Use radiant heater for spot heating $1,666 $3,000 - - $1,666
-
MMBtu
- - - - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $959 - $664
18,294
kWh
$295
-
kW-mo/yr
- - - - - -
06 2.4221: Install compressor air intakes in coolest locations $730 $1,500 $505
13,903
kWh
$225
-
kW-mo/yr
- - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $107 $295 $133
3,662
kWh
$50
-
kW-mo/yr
- - $(-32.0) - $(-44.0) -
08 3.3131: Use evaporation to concentrate material $454 $860 $(-83.0)
(-2,785)
kWh
- - $1,577
-
Tgal
- $(-1,040.0) - -
09 3.4151: Minimize water usage $692 $690 - - - $692
-
Tgal
- - - -
10 3.5316: Contract a wood pallet recycling company $2,250 $1,000 - - - - - - - $2,250
TOTAL RECOMMENDED $19,487 $11,045 $6,110
167,850
kWh
$2,599
-
kW-mo/yr
$7,375
-
MMBtu
$2,269
-
Tgal
$(-32.0) $(-1,040.0) $(-44.0) $2,250
TOTAL IMPLEMENTED $3,906 $1,300 $2,704
74,488
kWh
$1,202
-
kW-mo/yr
- - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs