ITAC Assessment: BD0227
ITAC logo
ITAC Assessment: BD0227
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Gray and Ductile Iron Casting Molds
NAICS 331511: Iron Foundries
SIC 3321: Gray and Ductile Iron Foundries
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 100,000
ft2
Annual Production 5,000
ton
Production Hrs. Annual 8,568
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $160,542 3,322,364
kWh
Electricity Demand $114,489 11,796
kW-mo/yr
Electricity Fees $3,175 -
Natural Gas $19,035 3,215
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,140 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,852

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $7,980 $3,000 $6,227
128,921
kWh
$1,753
-
kW-mo/yr
- - - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $6,495 - $5,028
107,829
kWh
$1,467
-
kW-mo/yr
- - - -
03 2.7231: Use radiant heater for spot heating $4,490 $7,000 - - $4,490
-
MMBtu
- - -
04 2.7135: Install occupancy sensors $2,617 $450 $2,104
43,550
kWh
$513
-
kW-mo/yr
- - - -
05 3.4115: Recover and reuse cooling water $31,410 $7,500 - - - $31,410
-
Tgal
- -
06 3.4151: Minimize water usage $17,898 - - - - $7,460
-
Tgal
$10,438 -
07 3.5316: Contract a wood pallet recycling company $11,250 $1,000 - - - - - $11,250
TOTAL RECOMMENDED $82,140 $18,950 $13,359
280,300
kWh
$3,733
-
kW-mo/yr
$4,490
-
MMBtu
$38,870
-
Tgal
$10,438 $11,250
TOTAL IMPLEMENTED $24,852 $8,450 $7,132
151,379
kWh
$1,980
-
kW-mo/yr
$4,490
-
MMBtu
- - $11,250
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs