ITAC Assessment: IP0160
ITAC logo
ITAC Assessment: IP0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Plastic Vehicle Exteriors
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 120,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $536,350 7,007,862
kWh
Electricity Demand $214,470 16,078
kW-mo/yr
Electricity Fees $68,332 -
Natural Gas $550,996 72,835
MMBtu
Waste Disposal Costs
Water Usage $26,656 8,728
Tgal
Water Disposal $86,738 8,728
Tgal
TOTAL YEARLY COSTS $1,483,542
RECOMMENDED SAVINGS* $22,172 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,279

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $13,174 - $10,006
111,173
kWh
$3,169
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,950 $10 $2,296
25,509
kWh
$654
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,154 $1,596 $1,980
22,001
kWh
$1,174
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,349 $1,448 $1,349
14,985
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,544 $1,747 $1,544
17,160
kWh
-
TOTAL RECOMMENDED $22,172 $4,801 $17,175
190,828
kWh
$4,997
-
kW-mo/yr
TOTAL IMPLEMENTED $19,279 $1,606 $14,281
158,683
kWh
$4,997
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs