Assessment Year | 1990 |
---|---|
Principal Product | FLUID MILK |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $10 M to 50M |
# of Employees | 65 |
Plant Area |
n/a
|
Annual Production | 18,000
Tgal
|
Production Hrs. Annual | 4,940
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $131,479 | 2,208,968 |
kWh
|
$0.060 |
Natural Gas | $47,647 | 14,193 |
MMBtu
|
$3.36 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $29,886 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1221: Replace obsolete burners with more efficient ones | $11,200 | $28,000 | - |
$11,200
-
MMBtu
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,370 | $12,000 | - |
$4,370
-
MMBtu
|
- | |
03 | 2.2437: Recover waste heat from equipment | $6,340 | $15,000 | - |
$6,340
-
MMBtu
|
- | |
04 | 2.8113: Purchase gas directly from a contract gas supplier | $5,000 | $1,200 | - |
$5,000
-
MMBtu
|
- | |
05 | 3.4151: Minimize water usage | $1,570 | $1,100 | - |
$745
-
MMBtu
|
$825 | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $935 | $1,700 |
$935
15,826
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $830 | $1,000 |
$830
13,775
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $576 | $267 |
$576
9,672
kWh
|
- | - | |
TOTAL RECOMMENDED | $30,821 | $60,267 |
$2,341
39,273
kWh
|
$27,655
-
MMBtu
|
$825 | ||
TOTAL IMPLEMENTED | $29,886 | $58,567 |
$1,406
23,447
kWh
|
$27,655
-
MMBtu
|
$825 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs