| Assessment Year | 1990 |
|---|---|
| Principal Product | FLUID MILK |
| NAICS |
n/a
|
| SIC | 2026: Fluid Milk |
| Sales Range | $10 M to 50M |
| # of Employees | 65 |
| Plant Area |
n/a
|
| Annual Production | 18,000
Tgal
|
| Production Hrs. Annual | 4,940
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $131,479 | 2,208,968 |
kWh
|
$0.060 |
| Natural Gas | $47,647 | 14,193 |
MMBtu
|
$3.36 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,821 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $29,886 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1221: Replace obsolete burners with more efficient ones | $11,200 | $28,000 | - |
$11,200
-
MMBtu
|
- | |
| 02 | 2.2414: Use waste heat from hot flue gases to preheat | $4,370 | $12,000 | - |
$4,370
-
MMBtu
|
- | |
| 03 | 2.2437: Recover waste heat from equipment | $6,340 | $15,000 | - |
$6,340
-
MMBtu
|
- | |
| 04 | 2.8113: Purchase gas directly from a contract gas supplier | $5,000 | $1,200 | - |
$5,000
-
MMBtu
|
- | |
| 05 | 3.4151: Minimize water usage | $1,570 | $1,100 | - |
$745
-
MMBtu
|
$825 | |
| 06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $935 | $1,700 |
$935
15,826
kWh
|
- | - | |
| 07 | 2.4221: Install compressor air intakes in coolest locations | $830 | $1,000 |
$830
13,775
kWh
|
- | - | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $576 | $267 |
$576
9,672
kWh
|
- | - | |
| TOTAL RECOMMENDED | $30,821 | $60,267 |
$2,341
39,273
kWh
|
$27,655
-
MMBtu
|
$825 | ||
| TOTAL IMPLEMENTED | $29,886 | $58,567 |
$1,406
23,447
kWh
|
$27,655
-
MMBtu
|
$825 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs