ITAC Assessment: BD0220
ITAC logo
ITAC Assessment: BD0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Non-Ferrous Castings
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $5
M
to 10
M
# of Employees 120
Plant Area 140,000
ft2
Annual Production 2,450,000
lb
Production Hrs. Annual 10,296
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,305 4,618,304
kWh
Electricity Demand $205,965 25,207
kW-mo/yr
Electricity Fees $(-22,816.0) -
Natural Gas $224,921 34,795
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $234,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,972

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $97,351 $42,000 $75,767
3,092,544
kWh
$60,736
-
kW-mo/yr
$(-39,152.0)
-
MMBtu
- - - -
02 2.7232: Replace existing hvac unit with high efficiency model $30,813 $19,400 - - $30,813
-
MMBtu
- - - -
03 2.2191: Substitute hot process fluids for steam $12,225 $5,000 - - $12,225
-
MMBtu
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,957 $900 $2,134
87,042
kWh
$1,823
-
kW-mo/yr
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,480 $1,700 $2,032
82,949
kWh
$1,448
-
kW-mo/yr
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $3,308 $3,000 $1,783
72,782
kWh
$1,525
-
kW-mo/yr
- - - - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,161 - $1,165
47,558
kWh
$996
-
kW-mo/yr
- - - - -
08 2.1123: Install automatic stack damper $1,938 $2,500 - - $1,938
-
MMBtu
- - - -
09 2.7135: Install occupancy sensors $1,733 $900 $986
40,260
kWh
$747
-
kW-mo/yr
- - - - -
10 2.1222: Install turbulators $925 $3,200 - - $925
-
MMBtu
- - - -
11 2.4133: Use most efficient type of electric motors $902 $3,010 $548
22,385
kWh
$354
-
kW-mo/yr
- - - - -
12 2.7142: Utilize higher efficiency lamps and/or ballasts $222 $80 $88
3,586
kWh
$62
-
kW-mo/yr
- - $72 - -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $154 $180 $49
1,997
kWh
$22
-
kW-mo/yr
- - $35 $48 -
14 3.5221: Recycle casting sand $1,621 $2,000 - - - $1,621
-
lb
- - -
15 3.6192: Use a less expensive method of waste removal $53,010 $1,000 - - - - - - $53,010
16 3.6192: Use a less expensive method of waste removal $14,760 $2,500 - - - - - - $14,760
17 4.447: Automate payroll system $6,370 $2,500 - - - - - - $6,370
TOTAL RECOMMENDED $234,930 $89,870 $84,552
3,451,103
kWh
$67,713
-
kW-mo/yr
$6,749
-
MMBtu
$1,621
-
lb
$107 $48 $74,140
TOTAL IMPLEMENTED $41,972 $24,200 $6,068
247,642
kWh
$5,091
-
kW-mo/yr
$30,813
-
MMBtu
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs