Assessment Year | 2002 |
---|---|
Principal Product | Prototype Heavy Earthmoving Equipment |
NAICS |
n/a
|
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 260 |
Plant Area |
170,000
ft2
|
Annual Production | 200
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,228 | 4,090,889 |
kWh
|
$0.031 |
Electricity Demand | $108,156 | 12,000 |
kW-mo/yr
|
$9.01 |
Electricity Fees | $2,390 | - |
|
- |
Natural Gas | $148,420 | 21,931 |
MMBtu
|
$6.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,478 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,517 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7231: Use radiant heater for spot heating | $20,195 | $31,000 |
$557
18,845
kWh
|
$316
-
kW-mo/yr
|
$19,322
-
MMBtu
|
- | - | |
02 | 2.1123: Install automatic stack damper | $7,722 | $5,000 | - | - |
$7,722
-
MMBtu
|
- | - | |
03 | 2.7135: Install occupancy sensors | $1,837 | $900 |
$879
28,458
kWh
|
$958
-
kW-mo/yr
|
- | - | - | |
04 | 2.2437: Recover waste heat from equipment | $1,754 | $1,000 | - | - |
$1,754
-
MMBtu
|
- | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,288 | $900 |
$919
29,777
kWh
|
$369
-
kW-mo/yr
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $302 | $1,000 |
$216
6,975
kWh
|
$86
-
kW-mo/yr
|
- | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $197 | $274 |
$72
2,315
kWh
|
$29
-
kW-mo/yr
|
- | $96 | - | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $32,683 | $40,000 | - | - |
$14,665
-
MMBtu
|
$18,018 | - | |
09 | 4.521: Clear and rent existing space | $7,500 | $1,000 | - | - | - | - | $7,500 | |
TOTAL RECOMMENDED | $73,478 | $81,074 |
$2,643
86,370
kWh
|
$1,758
-
kW-mo/yr
|
$43,463
-
MMBtu
|
$18,114 | $7,500 | ||
TOTAL IMPLEMENTED | $23,517 | $33,074 |
$2,427
79,395
kWh
|
$1,672
-
kW-mo/yr
|
$19,322
-
MMBtu
|
$96 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs