ITAC Assessment: BD0211
ITAC logo
ITAC Assessment: BD0211
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Prototype Heavy Earthmoving Equipment
NAICS
n/a
SIC 3531: Construction Machinery and Equipment
Sales Range $50
M
to 100
M
# of Employees 260
Plant Area 170,000
ft2
Annual Production 200
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $126,228 4,090,889
kWh
Electricity Demand $108,156 12,000
kW-mo/yr
Electricity Fees $2,390 -
Natural Gas $148,420 21,931
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $73,478 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,517

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.7231: Use radiant heater for spot heating $20,195 $31,000 $557
18,845
kWh
$316
-
kW-mo/yr
$19,322
-
MMBtu
- -
02 2.1123: Install automatic stack damper $7,722 $5,000 - - $7,722
-
MMBtu
- -
03 2.7135: Install occupancy sensors $1,837 $900 $879
28,458
kWh
$958
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $1,754 $1,000 - - $1,754
-
MMBtu
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,288 $900 $919
29,777
kWh
$369
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $302 $1,000 $216
6,975
kWh
$86
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $197 $274 $72
2,315
kWh
$29
-
kW-mo/yr
- $96 -
08 4.652: Replace existing equipment with more suitable substitutes $32,683 $40,000 - - $14,665
-
MMBtu
$18,018 -
09 4.521: Clear and rent existing space $7,500 $1,000 - - - - $7,500
TOTAL RECOMMENDED $73,478 $81,074 $2,643
86,370
kWh
$1,758
-
kW-mo/yr
$43,463
-
MMBtu
$18,114 $7,500
TOTAL IMPLEMENTED $23,517 $33,074 $2,427
79,395
kWh
$1,672
-
kW-mo/yr
$19,322
-
MMBtu
$96 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings Primary Product Savings