ITAC Assessment: UM0442
ITAC logo
ITAC Assessment: UM0442
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Hardwood Lumber
NAICS 321912: Cut Stock, Resawing Lumber, and Planing
SIC 2421: Sawmills and Planing Mills, General
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 500,000
ft2
Annual Production 14,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $396,776 5,508,246
kWh
Electricity Demand $113,203 13,313
kW-mo/yr
Natural Gas $258,082 47,159
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $191,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,444

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $143,338 $477,600 $248,948
3,476,928
kWh
$40,486
-
kW-mo/yr
$(-146,096.0)
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $33,315 $40,000 - - $33,315
-
MMBtu
03 2.2163: Use minimum steam operating pressure $10,229 $5,000 - - $10,229
-
MMBtu
04 2.2122: Install / repair insulation on condensate lines $4,900 $3,000 - - $4,900
-
MMBtu
TOTAL RECOMMENDED $191,782 $525,600 $248,948
3,476,928
kWh
$40,486
-
kW-mo/yr
$(-97,652.0)
-
MMBtu
TOTAL IMPLEMENTED $48,444 $48,000 - - $48,444
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs