Assessment Year | 2014 |
---|---|
Principal Product | Hardwood Lumber |
NAICS | 321912: Cut Stock, Resawing Lumber, and Planing |
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $10 M to 50M |
# of Employees | 45 |
Plant Area |
500,000
ft2
|
Annual Production | 14,000
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $396,776 | 5,508,246 |
kWh
|
$0.072 |
Electricity Demand | $113,203 | 13,313 |
kW-mo/yr
|
$8.50 |
Natural Gas | $258,082 | 47,159 |
MMBtu
|
$5.47 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $191,782 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,444 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3412: Use waste heat to produce steam to drive a steam turbine-generator | $143,338 | $477,600 |
$248,948
3,476,928
kWh
|
$40,486
-
kW-mo/yr
|
$(-146,096.0)
-
MMBtu
|
|
02 | 2.2414: Use waste heat from hot flue gases to preheat | $33,315 | $40,000 | - | - |
$33,315
-
MMBtu
|
|
03 | 2.2163: Use minimum steam operating pressure | $10,229 | $5,000 | - | - |
$10,229
-
MMBtu
|
|
04 | 2.2122: Install / repair insulation on condensate lines | $4,900 | $3,000 | - | - |
$4,900
-
MMBtu
|
|
TOTAL RECOMMENDED | $191,782 | $525,600 |
$248,948
3,476,928
kWh
|
$40,486
-
kW-mo/yr
|
$(-97,652.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $48,444 | $48,000 | - | - |
$48,444
-
MMBtu
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs