ITAC Assessment: BD0195
ITAC logo
ITAC Assessment: BD0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Ball and Roller Bearings
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 213,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $854,857 18,067,488
kWh
Electricity Demand $116,666 34,301
kW-mo/yr
Electricity Fees $51,216 -
Natural Gas $48,169 11,467
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,917 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $838

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.4133: Use most efficient type of electric motors $23,060 $28,920 n/a $21,226
448,771
kWh
$1,834
-
kW-mo/yr
- - -
02 2.2437: Recover waste heat from equipment $15,876 $16,455 n/a - - $15,876
-
MMBtu
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,419 $7,120 $4,891
103,409
kWh
$528
-
kW-mo/yr
- - -
04 2.7231: Use radiant heater for spot heating $4,255 $4,000 - - $4,255
-
MMBtu
- -
05 2.7135: Install occupancy sensors $3,191 $1,200 $2,738
57,878
kWh
$453
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $2,345 $1,000 $2,103
44,454
kWh
$242
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $2,269 $1,500 - - $2,269
-
MMBtu
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $838 $400 $751
15,864
kWh
$87
-
kW-mo/yr
- - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $559 $541 $283
5,992
kWh
$28
-
kW-mo/yr
- - $248
10 3.3131: Use evaporation to concentrate material $13,105 $27,000 n/a - - - $13,105
-
Tgal
-
TOTAL RECOMMENDED $70,917 $88,136 $31,992
676,368
kWh
$3,172
-
kW-mo/yr
$22,400
-
MMBtu
$13,105
-
Tgal
$248
TOTAL IMPLEMENTED $838 $400 $751
15,864
kWh
$87
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs