Assessment Year | 2001 |
---|---|
Principal Product | Ferrous Products/Aluminum |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
201,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 8,008
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $212,359 | 6,193,142 |
kWh
|
$0.034 |
Electricity Demand | $155,286 | 16,872 |
kW-mo/yr
|
$9.20 |
Electricity Fees | $7,106 | - |
|
- |
Natural Gas | $64,554 | 13,927 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,579 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,288 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,288 | $500 |
$2,346
68,288
kWh
|
$942
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7135: Install occupancy sensors | $3,171 | $1,425 |
$2,036
59,496
kWh
|
$1,135
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.4314: Use synthetic lubricant | $2,294 | $500 |
$1,636
47,773
kWh
|
$658
-
kW-mo/yr
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,988 | - |
$1,418
41,325
kWh
|
$570
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,694 | $3,090 |
$1,302
38,101
kWh
|
$392
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $726 | $500 |
$518
15,240
kWh
|
$208
-
kW-mo/yr
|
- | - | - | - | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $31,899 | $40,000 | - | - |
$23,309
-
MMBtu
|
$8,590 | - | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $27,022 | $30,000 | - | - | - | - | $27,022 | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $3,497 | $10,000 |
$(-4,353.0)
(-126,905)
kWh
|
$(-1,750.0)
-
kW-mo/yr
|
- | - | - | $9,600 | |
TOTAL RECOMMENDED | $75,579 | $86,015 |
$4,903
143,318
kWh
|
$2,155
-
kW-mo/yr
|
$23,309
-
MMBtu
|
$8,590 | $27,022 | $9,600 | ||
TOTAL IMPLEMENTED | $3,288 | $500 |
$2,346
68,288
kWh
|
$942
-
kW-mo/yr
|
- | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #1 Savings | Personnel Changes Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs