ITAC Assessment: BD0173
ITAC logo
ITAC Assessment: BD0173
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Municipal and Industrial Storage Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 480,000
ft2
Annual Production 500
units
Production Hrs. Annual 4,200
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $447,233 9,075,029
kWh
Electricity Demand $202,602 24,817
kW-mo/yr
Electricity Fees $(-159.0) -
Natural Gas $377,488 127,964
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $441,363 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $392,698

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
01 2.1221: Replace obsolete burners with more efficient ones $31,116 $16,000 n/a - - $31,116
-
MMBtu
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,742 $600 $7,263
138,042
kWh
$2,479
-
kW-mo/yr
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $7,471 $1,000 $5,569
105,803
kWh
$1,902
-
kW-mo/yr
- - - - -
04 4.111: Add equipment/ operators to reduce production bottleneck $2,576 $10,000 - - $2,576
-
MMBtu
- - - -
05 2.7135: Install occupancy sensors $1,220 $1,050 $646
12,309
kWh
$574
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $805 $660 $403
7,620
kWh
$86
-
kW-mo/yr
- - - $316 -
07 2.2437: Recover waste heat from equipment $664 $750 - - $664
-
MMBtu
- - - -
08 3.4151: Minimize water usage $2,833 $3,300 - - - $2,833
-
Tgal
- - -
09 3.5316: Contract a wood pallet recycling company $1,980 $500 - - - - $1,980
-
lb
- -
10 4.521: Clear and rent existing space $382,956 $150,000 - - - - - - $382,956
TOTAL RECOMMENDED $441,363 $183,860 $13,881
263,774
kWh
$5,041
-
kW-mo/yr
$34,356
-
MMBtu
$2,833
-
Tgal
$1,980
-
lb
$316 $382,956
TOTAL IMPLEMENTED $392,698 $150,600 $7,263
138,042
kWh
$2,479
-
kW-mo/yr
- - - - $382,956
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs