ITAC Assessment: BD0170
ITAC logo
ITAC Assessment: BD0170
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Insulated Containers
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 50,000
ft2
Annual Production 587,950
lb
Production Hrs. Annual 6,656
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,501 798,652
kWh
Electricity Demand $30,134 2,411
kW-mo/yr
Electricity Fees $1,860 -
Natural Gas $30,889 8,489
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,711 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,892

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
01 2.2437: Recover waste heat from equipment $3,239 $9,800 - - $3,239
-
MMBtu
- - -
02 2.4221: Install compressor air intakes in coolest locations $1,396 $300 $898
21,981
kWh
$498
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,396 $800 $895
21,981
kWh
$501
-
kW-mo/yr
- - - -
04 2.7135: Install occupancy sensors $1,094 $750 $513
12,603
kWh
$581
-
kW-mo/yr
- - - -
05 2.6218: Turn off equipment when not in use $1,027 $200 $453
11,137
kWh
$574
-
kW-mo/yr
- - - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $743 - $478
11,723
kWh
$265
-
kW-mo/yr
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $281 $270 $100
2,345
kWh
$43
-
kW-mo/yr
- - $138 -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $6,572 $7,500 - - - $6,572
-
lb
- -
09 3.5316: Contract a wood pallet recycling company $6,300 $225 - - - $6,300
-
lb
- -
10 3.5313: Increase amount of waste recovered for resale $416 $225 - - - - - $416
11 4.821: Pay bills on time to avoid late fees $247 - - - - - $247 -
TOTAL RECOMMENDED $22,711 $20,070 $3,337
81,770
kWh
$2,462
-
kW-mo/yr
$3,239
-
MMBtu
$12,872
-
lb
$385 $416
TOTAL IMPLEMENTED $9,892 $8,870 $1,893
46,307
kWh
$1,042
-
kW-mo/yr
- $6,572
-
lb
$385 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings One-time Revenue or Avoided Cost Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs