ITAC Assessment: SU0388
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Plastic Injection Molding and Tooling
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 77,000
ft2
Annual Production 330,700,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $462,866 6,270,326
kWh
Electricity Demand $260,201 19,784
kW-mo/yr
Natural Gas $3,402 392
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,642 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,940

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,565 $1,340 $3,565
48,308
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,375 $2,025 $4,375
59,280
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $26,157 $26,290 $20,253
274,435
kWh
$5,904
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $333 $340 $123
1,664
kWh
$30
-
kW-mo/yr
$180
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,212 $8,485 $2,005
27,156
kWh
$978
-
kW-mo/yr
$229
TOTAL RECOMMENDED $37,642 $38,480 $30,321
410,843
kWh
$6,912
-
kW-mo/yr
$409
TOTAL IMPLEMENTED $7,940 $3,365 $7,940
107,588
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs