ITAC Assessment: AS0123
ITAC logo
ITAC Assessment: AS0123
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product truck bodies
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 81,600
ft2
Annual Production 4,000
pieces
Production Hrs. Annual 3,575
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,045 1,113,423
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,344 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,141

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.6231: Utilize controls to operate equipment only when needed $3,476 $3,000 $3,476
32,239
kWh
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,783 $2,800 $5,783
53,634
kWh
03 2.4133: Use most efficient type of electric motors $2,051 $2,241 $2,051
19,050
kWh
04 2.6218: Turn off equipment when not in use $1,552 $360 $1,552
14,361
kWh
05 2.7132: Install timers on light switches in little used areas $878 $1,575 $878
8,206
kWh
06 2.7134: Use photocell controls $1,809 $390 $1,809
16,706
kWh
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,651 $7,224 $2,651
24,619
kWh
08 2.7142: Utilize higher efficiency lamps and/or ballasts $1,144 $1,902 $1,144
10,551
kWh
TOTAL RECOMMENDED $19,344 $19,492 $19,344
179,366
kWh
TOTAL IMPLEMENTED $15,141 $11,908 $15,141
140,386
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs