Assessment Year | 2000 |
---|---|
Principal Product | Telecommunication Products |
NAICS |
n/a
|
SIC | 3679: Electronic Components, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 250 |
Plant Area |
56,750
ft2
|
Annual Production | 325,000
pieces
|
Production Hrs. Annual | 5,460
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $180,349 | 2,319,461 |
kWh
|
$0.078 |
Natural Gas | $6,157 | 1,100 |
MMBtu
|
$5.60 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,355,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,339,803 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $4,409 | $975 |
$4,409
56,565
kWh
|
- | - | - | - | |
02 | 2.2437: Recover waste heat from equipment | $3,060 | $2,500 | - |
$3,060
-
MMBtu
|
- | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $644 | $600 |
$644
8,206
kWh
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $466 | - |
$466
5,862
kWh
|
- | - | - | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $600 | $500 | - | - |
$600
-
lb
|
- | - | |
06 | 3.5311: Recover and reuse waste material | $593 | $1,500 | - | - |
$593
-
lb
|
- | - | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $2,334,150 | $189,000 | - | - | - | - | $2,334,150 | |
08 | 2.8113: Purchase gas directly from a contract gas supplier | $6,116 | $800 | - | - | - | $6,116 | - | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $5,487 | $10,100 | - | - | - | $5,487 | - | |
TOTAL RECOMMENDED | $2,355,525 | $205,975 |
$5,519
70,633
kWh
|
$3,060
-
MMBtu
|
$1,193
-
lb
|
$11,603 | $2,334,150 | ||
TOTAL IMPLEMENTED | $2,339,803 | $191,075 |
$5,053
64,771
kWh
|
- |
$600
-
lb
|
- | $2,334,150 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs