ITAC Assessment: BD0150
ITAC logo
ITAC Assessment: BD0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Alluminium Rolled Formed Products
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 211,000
ft2
Annual Production 35,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $189,671 5,703,107
kWh
Electricity Demand $149,456 13,569
kW-mo/yr
Electricity Fees $1,763 -
Natural Gas $125,160 50,181
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $70,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,703

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings Increase in Production Savings
01 2.4133: Use most efficient type of electric motors $8,594 $12,790 $6,142
184,349
kWh
$2,452
-
kW-mo/yr
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,322 $6,908 $4,786
143,611
kWh
$2,536
-
kW-mo/yr
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $5,905 $1,000 $3,860
116,061
kWh
$2,045
-
kW-mo/yr
- - - - -
04 2.7135: Install occupancy sensors $3,844 $3,750 - $1,727
-
kW-mo/yr
$2,117
-
MMBtu
- - - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,726 $650 $2,436
67,409
kWh
$1,290
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $257 $310 $82
2,345
kWh
$37
-
kW-mo/yr
- - $138 - -
07 4.514: Re-arrange equipment layout to reduce handling costs $26,208 $5,000 - - - - - - $26,208
08 4.321: Optimize production lot sizes and inventories $14,100 $7,200 - - - - - $14,100 -
09 4.821: Pay bills on time to avoid late fees $426 - - - - $426 - - -
TOTAL RECOMMENDED $70,382 $37,608 $17,306
513,775
kWh
$10,087
-
kW-mo/yr
$2,117
-
MMBtu
$426 $138 $14,100 $26,208
TOTAL IMPLEMENTED $48,703 $23,190 $12,438
367,819
kWh
$7,514
-
kW-mo/yr
$2,117
-
MMBtu
$426 - - $26,208
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs