ITAC Assessment: BD0147
ITAC logo
ITAC Assessment: BD0147
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Elevator Hoisting Equipment
NAICS
n/a
SIC 3534: Elevators and Moving Stairways
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 190,000
ft2
Annual Production 1,500
lb
Production Hrs. Annual 2,470
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,425 1,746,776
kWh
Electricity Demand $73,688 6,743
kW-mo/yr
Electricity Fees $769 -
Natural Gas $25,546 6,024
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,259 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,918

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $3,585 $10,050 $1,667
48,066
kWh
$1,918
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,372 $1,200 $937
26,964
kWh
$1,435
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $966 $525 $393
11,430
kWh
$573
-
kW-mo/yr
-
04 2.4221: Install compressor air intakes in coolest locations $710 $800 $280
8,206
kWh
$430
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $627 $1,215 $291
8,499
kWh
$336
-
kW-mo/yr
-
06 3.5313: Increase amount of waste recovered for resale $631 $800 - - $631
07 4.441: Install automatic packing equipment $4,368 $7,000 - - $4,368
TOTAL RECOMMENDED $13,259 $21,590 $3,568
103,165
kWh
$4,692
-
kW-mo/yr
$4,999
TOTAL IMPLEMENTED $11,918 $19,990 $3,288
94,959
kWh
$4,262
-
kW-mo/yr
$4,368
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs