Assessment Year | 1999 |
---|---|
Principal Product | Elevator Hoisting Equipment |
NAICS |
n/a
|
SIC | 3534: Elevators and Moving Stairways |
Sales Range | $10 M to 50M |
# of Employees | 140 |
Plant Area |
190,000
ft2
|
Annual Production | 1,500
lb
|
Production Hrs. Annual | 2,470
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $60,425 | 1,746,776 |
kWh
|
$0.035 |
Electricity Demand | $73,688 | 6,743 |
kW-mo/yr
|
$10.93 |
Electricity Fees | $769 | - |
|
- |
Natural Gas | $25,546 | 6,024 |
MMBtu
|
$4.24 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $13,259 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,918 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,585 | $10,050 |
$1,667
48,066
kWh
|
$1,918
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,372 | $1,200 |
$937
26,964
kWh
|
$1,435
-
kW-mo/yr
|
- | |
03 | 2.7135: Install occupancy sensors | $966 | $525 |
$393
11,430
kWh
|
$573
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $710 | $800 |
$280
8,206
kWh
|
$430
-
kW-mo/yr
|
- | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $627 | $1,215 |
$291
8,499
kWh
|
$336
-
kW-mo/yr
|
- | |
06 | 3.5313: Increase amount of waste recovered for resale | $631 | $800 | - | - | $631 | |
07 | 4.441: Install automatic packing equipment | $4,368 | $7,000 | - | - | $4,368 | |
TOTAL RECOMMENDED | $13,259 | $21,590 |
$3,568
103,165
kWh
|
$4,692
-
kW-mo/yr
|
$4,999 | ||
TOTAL IMPLEMENTED | $11,918 | $19,990 |
$3,288
94,959
kWh
|
$4,262
-
kW-mo/yr
|
$4,368 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs