Assessment Year | 1999 |
---|---|
Principal Product | Screen Printed Decals |
NAICS |
n/a
|
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $10 M to 50M |
# of Employees | 130 |
Plant Area |
36,000
ft2
|
Annual Production | 2,000,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,075 | 1,277,257 |
kWh
|
$0.065 |
Natural Gas | $10,631 | 2,476 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $282,010 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,974 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,585 | $3,180 |
$2,038
31,360
kWh
|
- | $118 | $429 | - | - | |
02 | 2.4133: Use most efficient type of electric motors | $804 | $830 |
$804
12,309
kWh
|
- | - | - | - | - | |
03 | 2.7135: Install occupancy sensors | $772 | $675 |
$772
12,016
kWh
|
- | - | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,614 | $2,480 |
$971
14,947
kWh
|
$643
-
MMBtu
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $185 | $350 |
$185
2,931
kWh
|
- | - | - | - | - | |
06 | 2.7111: Reduce illumination to minimum necessary levels | $203,250 | $2,000 | - | - | - | - | - | $203,250 | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $49,400 | $12,647 | - | - | - | - | $49,400 | - | |
08 | 2.7135: Install occupancy sensors | $23,400 | $10,000 | - | - | - | - | $23,400 | - | |
TOTAL RECOMMENDED | $282,010 | $32,162 |
$4,770
73,563
kWh
|
$643
-
MMBtu
|
$118 | $429 | $72,800 | $203,250 | ||
TOTAL IMPLEMENTED | $26,974 | $14,360 |
$3,027
46,600
kWh
|
- | $118 | $429 | $23,400 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Product Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs