Assessment Year | 1996 |
---|---|
Principal Product | Stoneware |
NAICS |
n/a
|
SIC | 3296: Mineral Wool |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
180,000
ft2
|
Annual Production | 2,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,558 | 2,141,559 |
kWh
|
$0.046 |
Electricity Demand | $59,686 | 6,203 |
kW-mo/yr
|
$9.62 |
Electricity Fees | $(-5,376.0) | - |
|
- |
Natural Gas | $279,338 | 94,990 |
MMBtu
|
$2.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $67,818 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $45,183 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $30,964 | $19,800 | - | - |
$30,964
-
MMBtu
|
- | |
02 | 2.4133: Use most efficient type of electric motors | $11,282 | $17,740 |
$9,041
224,795
kWh
|
$2,241
-
kW-mo/yr
|
- | - | |
03 | 2.4226: Use / purchase optimum sized compressor | $6,185 | $2,000 |
$6,185
153,869
kWh
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,804 | $1,804 |
$1,446
36,049
kWh
|
$358
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,203 | - |
$1,203
29,894
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,025 | $500 |
$1,025
25,498
kWh
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $959 | $975 |
$712
17,585
kWh
|
$247
-
kW-mo/yr
|
- | - | |
08 | 3.4115: Recover and reuse cooling water | $12,484 | $3,600 |
$(-500.0)
(-12,309)
kWh
|
- | - |
$12,984
-
Tgal
|
|
09 | 3.4151: Minimize water usage | $1,912 | $1,250 | - | - | - |
$1,912
-
Tgal
|
|
TOTAL RECOMMENDED | $67,818 | $47,669 |
$19,112
475,381
kWh
|
$2,846
-
kW-mo/yr
|
$30,964
-
MMBtu
|
$14,896
-
Tgal
|
||
TOTAL IMPLEMENTED | $45,183 | $39,290 |
$10,066
250,293
kWh
|
$2,241
-
kW-mo/yr
|
$30,964
-
MMBtu
|
$1,912
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs