ITAC Assessment: BD0075
ITAC logo
ITAC Assessment: BD0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Stoneware
NAICS
n/a
SIC 3296: Mineral Wool
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 180,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,558 2,141,559
kWh
Electricity Demand $59,686 6,203
kW-mo/yr
Electricity Fees $(-5,376.0) -
Natural Gas $279,338 94,990
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,818 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $45,183

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.2511: Insulate bare equipment $30,964 $19,800 - - $30,964
-
MMBtu
-
02 2.4133: Use most efficient type of electric motors $11,282 $17,740 $9,041
224,795
kWh
$2,241
-
kW-mo/yr
- -
03 2.4226: Use / purchase optimum sized compressor $6,185 $2,000 $6,185
153,869
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,804 $1,804 $1,446
36,049
kWh
$358
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,203 - $1,203
29,894
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,025 $500 $1,025
25,498
kWh
- - -
07 2.7135: Install occupancy sensors $959 $975 $712
17,585
kWh
$247
-
kW-mo/yr
- -
08 3.4115: Recover and reuse cooling water $12,484 $3,600 $(-500.0)
(-12,309)
kWh
- - $12,984
-
Tgal
09 3.4151: Minimize water usage $1,912 $1,250 - - - $1,912
-
Tgal
TOTAL RECOMMENDED $67,818 $47,669 $19,112
475,381
kWh
$2,846
-
kW-mo/yr
$30,964
-
MMBtu
$14,896
-
Tgal
TOTAL IMPLEMENTED $45,183 $39,290 $10,066
250,293
kWh
$2,241
-
kW-mo/yr
$30,964
-
MMBtu
$1,912
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs