ITAC Assessment: BD0141
ITAC logo
ITAC Assessment: BD0141
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Blue Cheese
NAICS
n/a
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 27,750
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $35,747 1,471,864
kWh
Electricity Demand $31,860 3,388
kW-mo/yr
Electricity Fees $654 -
Natural Gas $47,162 15,640
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,467 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2442: Preheat combustion air with waste heat $3,170 $8,000 - - $3,170
-
MMBtu
- - -
02 2.7135: Install occupancy sensors $1,259 $825 $825
33,998
kWh
$434
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $12,301 $500 $7,967
214,537
kWh
$4,334
-
kW-mo/yr
- - - -
04 2.1222: Install turbulators $466 $840 $466
48,066
kWh
- - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $258 $230 $137
5,569
kWh
$121
-
kW-mo/yr
- - - -
06 2.2449: Recover heat from exhausted steam, hot air or hot water $2,014 $1,250 - - - $2,115
-
gal
- $(-101.0)
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $994 $90,000 $673
27,550
kWh
$321
-
kW-mo/yr
- - - -
08 4.446: Automate finishing process $10,005 $29,600 - - - - $10,005 -
TOTAL RECOMMENDED $30,467 $131,245 $10,068
329,720
kWh
$5,210
-
kW-mo/yr
$3,170
-
MMBtu
$2,115
-
gal
$10,005 $(-101.0)
TOTAL IMPLEMENTED $12,301 $500 $7,967
214,537
kWh
$4,334
-
kW-mo/yr
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs