Assessment Year | 1999 |
---|---|
Principal Product | Machined Metal Products |
NAICS |
n/a
|
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $5 M to 10M |
# of Employees | 62 |
Plant Area |
36,000
ft2
|
Annual Production | 2,500,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $78,454 | 989,449 |
kWh
|
$0.079 |
Natural Gas | $5,152 | 1,169 |
MMBtu
|
$4.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,993 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,342 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Water Disposal Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,412 | $4,890 |
$4,412
55,686
kWh
|
- | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,871 | - |
$1,871
23,740
kWh
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,635 | $225 |
$1,635
20,516
kWh
|
- | - | |
04 | 2.7135: Install occupancy sensors | $1,559 | $900 |
$1,559
19,637
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $1,173 | $600 |
$1,173
14,947
kWh
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $966 | $969 |
$966
12,309
kWh
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $735 | $500 |
$735
9,379
kWh
|
- | - | |
08 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $662 | $380 |
$662
8,499
kWh
|
- | - | |
09 | 3.4111: Use closed cycle process to minimize waste water production | $2,707 | $10,000 |
$(-259.0)
(-3,224)
kWh
|
$3,366
-
Tgal
|
$(-400.0) | |
10 | 3.4151: Minimize water usage | $793 | $1,540 | - |
$793
-
Tgal
|
- | |
11 | 4.441: Install automatic packing equipment | $11,480 | $45,000 | - | - | $11,480 | |
TOTAL RECOMMENDED | $27,993 | $65,004 |
$12,754
161,489
kWh
|
$4,159
-
Tgal
|
$11,080 | ||
TOTAL IMPLEMENTED | $4,342 | $10,225 |
$1,376
17,292
kWh
|
$3,366
-
Tgal
|
$(-400.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Water Disposal Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs