ITAC Assessment: BD0127
ITAC logo
ITAC Assessment: BD0127
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Steel Wheels
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 40,125
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $39,879 974,209
kWh
Electricity Demand $37,127 3,079
kW-mo/yr
Electricity Fees $486 -
Natural Gas $12,946 3,026
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,494 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,406 $1,050 n/a $2,801
74,736
kWh
$2,605
-
kW-mo/yr
- - -
02 2.2443: Re-use or recycle hot or cold process exhaust air $1,974 $4,400 n/a - - $1,974
-
MMBtu
- -
03 2.4221: Install compressor air intakes in coolest locations $1,351 $500 n/a $700
18,757
kWh
$651
-
kW-mo/yr
- - -
04 2.1224: Replace boiler $839 $1,050 n/a $173
4,689
kWh
$89
-
kW-mo/yr
$577
-
MMBtu
- -
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $726 $1,100 n/a $760
20,516
kWh
$273
-
kW-mo/yr
$(-307.0)
-
MMBtu
- -
06 2.7135: Install occupancy sensors $467 $600 n/a $220
5,862
kWh
$247
-
kW-mo/yr
- - -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $292 $260 n/a $172
4,689
kWh
$120
-
kW-mo/yr
- - -
08 3.2123: Convert to high volume low pressure (hvlp) paint guns - $2,000 n/a - - - - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler - $6,500 n/a - - - - -
10 3.4151: Minimize water usage $314 $1,085 n/a - - - $314
-
Tgal
-
11 2.8112: Combine utility meters $1,125 $100 n/a - - - - $1,125
TOTAL RECOMMENDED $12,494 $18,645 $4,826
129,249
kWh
$3,985
-
kW-mo/yr
$2,244
-
MMBtu
$314
-
Tgal
$1,125
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings