ITAC Assessment: BD0117
ITAC logo
ITAC Assessment: BD0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product printed material
NAICS
n/a
SIC 2700:
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 29,106
ft2
Annual Production 50,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,382 1,087,046
kWh
Electricity Demand $9,528 4,047
kW-mo/yr
Electricity Fees $816 -
Natural Gas $10,303 2,219
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,465 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $4,633 $4,940 $4,023
62,720
kWh
$610
-
kW-mo/yr
- - -
02 2.7135: Install occupancy sensors $2,244 $850 $1,596
24,912
kWh
$648
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,736 $650 $1,510
23,447
kWh
$226
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $930 $278 $808
12,603
kWh
$122
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $474 - $412
6,448
kWh
$62
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $701 $335 $235
3,810
kWh
$40
-
kW-mo/yr
- - $426
07 2.1222: Install turbulators $277 $500 - - $277
-
MMBtu
- -
08 2.4314: Use synthetic lubricant $238 $400 $206
3,224
kWh
$32
-
kW-mo/yr
- - -
09 2.4221: Install compressor air intakes in coolest locations $164 $250 $142
2,345
kWh
$22
-
kW-mo/yr
- - -
10 3.1191: Change procedures / equipment / operating conditions $2,584 $1,500 - - - $2,584
-
Tgal
-
11 4.513: Re-arrange equipment layout to reduce labor costs $16,484 $10,000 - - - - $16,484
TOTAL RECOMMENDED $30,465 $19,703 $8,932
139,509
kWh
$1,762
-
kW-mo/yr
$277
-
MMBtu
$2,584
-
Tgal
$16,910
TOTAL IMPLEMENTED $25,714 $17,590 $5,533
86,167
kWh
$836
-
kW-mo/yr
$277
-
MMBtu
$2,584
-
Tgal
$16,484
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs