Assessment Year | 1998 |
---|---|
Principal Product | printed material |
NAICS |
n/a
|
SIC | 2700: |
Sales Range | $10 M to 50M |
# of Employees | 87 |
Plant Area |
29,106
ft2
|
Annual Production | 50,000,000
pieces
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $69,382 | 1,087,046 |
kWh
|
$0.064 |
Electricity Demand | $9,528 | 4,047 |
kW-mo/yr
|
$2.35 |
Electricity Fees | $816 | - |
|
- |
Natural Gas | $10,303 | 2,219 |
MMBtu
|
$4.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,465 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $25,714 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,633 | $4,940 |
$4,023
62,720
kWh
|
$610
-
kW-mo/yr
|
- | - | - | |
02 | 2.7135: Install occupancy sensors | $2,244 | $850 |
$1,596
24,912
kWh
|
$648
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,736 | $650 |
$1,510
23,447
kWh
|
$226
-
kW-mo/yr
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $930 | $278 |
$808
12,603
kWh
|
$122
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $474 | - |
$412
6,448
kWh
|
$62
-
kW-mo/yr
|
- | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $701 | $335 |
$235
3,810
kWh
|
$40
-
kW-mo/yr
|
- | - | $426 | |
07 | 2.1222: Install turbulators | $277 | $500 | - | - |
$277
-
MMBtu
|
- | - | |
08 | 2.4314: Use synthetic lubricant | $238 | $400 |
$206
3,224
kWh
|
$32
-
kW-mo/yr
|
- | - | - | |
09 | 2.4221: Install compressor air intakes in coolest locations | $164 | $250 |
$142
2,345
kWh
|
$22
-
kW-mo/yr
|
- | - | - | |
10 | 3.1191: Change procedures / equipment / operating conditions | $2,584 | $1,500 | - | - | - |
$2,584
-
Tgal
|
- | |
11 | 4.513: Re-arrange equipment layout to reduce labor costs | $16,484 | $10,000 | - | - | - | - | $16,484 | |
TOTAL RECOMMENDED | $30,465 | $19,703 |
$8,932
139,509
kWh
|
$1,762
-
kW-mo/yr
|
$277
-
MMBtu
|
$2,584
-
Tgal
|
$16,910 | ||
TOTAL IMPLEMENTED | $25,714 | $17,590 |
$5,533
86,167
kWh
|
$836
-
kW-mo/yr
|
$277
-
MMBtu
|
$2,584
-
Tgal
|
$16,484 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs