ITAC Assessment: BD0114
ITAC logo
ITAC Assessment: BD0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Turbine Pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 93,517
ft2
Annual Production 1,275
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,799 1,257,034
kWh
Electricity Demand $29,013 3,994
kW-mo/yr
Electricity Fees $3,200 -
Natural Gas $39,363 7,685
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,281 $15,250 $5,307
126,905
kWh
$3,545
-
kW-mo/yr
- - $429
02 2.7135: Install occupancy sensors $5,471 $2,025 $3,502
83,822
kWh
$1,969
-
kW-mo/yr
- - -
03 2.1213: Direct warmest air to combustion intake $2,053 $5,000 - - $2,053
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,083 $2,257 $649
15,533
kWh
$434
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $281 $200 $168
4,103
kWh
$113
-
kW-mo/yr
- - -
06 3.5111: Filter and reuse hydraulic oil $4,256 $1,125 - - - - $4,256
07 3.5315: Lease / purchase baler; sell cardboard to recycler $2,147 $250 - - - - $2,147
08 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,921 $1,300 - - - $1,921
-
gal
-
09 4.112: Replace old machine with new automatic multi-station tool $5,289 $4,395 - - - - $5,289
TOTAL RECOMMENDED $31,782 $31,802 $9,626
230,363
kWh
$6,061
-
kW-mo/yr
$2,053
-
MMBtu
$1,921
-
gal
$12,121
TOTAL IMPLEMENTED $17,800 $22,152 $5,956
142,438
kWh
$3,979
-
kW-mo/yr
- - $7,865
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs