ITAC Assessment: BD0110
ITAC logo
ITAC Assessment: BD0110
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Plastic Moldings
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 68,400
ft2
Annual Production 16,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $174,900 3,910,317
kWh
Electricity Demand $100,651 8,261
kW-mo/yr
Electricity Fees $3,160 -
Natural Gas $11,480 2,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,419 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,658 $3,870 $1,552
35,170
kWh
$685
-
kW-mo/yr
- $421
02 2.7135: Install occupancy sensors $2,694 $900 $1,891
42,790
kWh
$803
-
kW-mo/yr
- -
03 2.2223: Enhance sensitivity of temperature control and cutoff $2,600 $450 - - $2,600
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,729 $3,200 $967
29,894
kWh
$585
-
kW-mo/yr
- $177
05 2.4221: Install compressor air intakes in coolest locations $920 $200 $639
14,361
kWh
$281
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $686 $850 $419
9,379
kWh
$267
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $374 $335 $162
3,810
kWh
$61
-
kW-mo/yr
- $151
08 3.5315: Lease / purchase baler; sell cardboard to recycler $4,269 $7,000 - - - $4,269
09 3.5315: Lease / purchase baler; sell cardboard to recycler $3,024 $500 - - - $3,024
10 4.122: Develop standard procedures to improve internal yields $15,465 $1,500 $4,298
97,011
kWh
$2,167
-
kW-mo/yr
- $9,000
TOTAL RECOMMENDED $34,419 $18,805 $9,928
232,415
kWh
$4,849
-
kW-mo/yr
$2,600
-
MMBtu
$17,042
TOTAL IMPLEMENTED $18,439 $2,285 $4,460
100,821
kWh
$2,228
-
kW-mo/yr
$2,600
-
MMBtu
$9,151
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs