ITAC Assessment: BD0107
ITAC logo
ITAC Assessment: BD0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Chemical Conversion Coatings
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 61,940
ft2
Annual Production 38,993,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,543 2,269,930
kWh
Electricity Demand $53,047 4,344
kW-mo/yr
Electricity Fees $655 -
Natural Gas $89,252 26,007
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,957 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $22,112

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings
01 2.4224: Upgrade controls on compressors $19,185 $31,500 $7,909
212,192
kWh
$11,276
-
kW-mo/yr
- - - -
02 2.2441: Preheat boiler makeup water with waste process heat $2,679 $6,000 - - $2,679
-
MMBtu
- - -
03 2.4221: Install compressor air intakes in coolest locations $1,897 $1,000 $1,897
50,996
kWh
- - - - -
04 2.1123: Install automatic stack damper $1,388 $2,500 - - $1,388
-
MMBtu
- - -
05 2.7135: Install occupancy sensors $750 $300 $492
13,189
kWh
$258
-
kW-mo/yr
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $278 $470 $133
3,517
kWh
$145
-
kW-mo/yr
- - - -
07 3.3122: Use filtration, centrifuging to remove contaminants $21,088 $7,500 - - - $23,688
-
Tgal
$(-2,600.0) -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $1,899 $7,000 - - - - $(-201.0) $2,100
09 3.1191: Change procedures / equipment / operating conditions $443 $60 - - - $261
-
Tgal
$182 -
10 4.652: Replace existing equipment with more suitable substitutes $10,350 $750 - - - - - $10,350
TOTAL RECOMMENDED $59,957 $57,080 $10,431
279,894
kWh
$11,679
-
kW-mo/yr
$4,067
-
MMBtu
$23,949
-
Tgal
$(-2,619.0) $12,450
TOTAL IMPLEMENTED $22,112 $39,270 $8,534
228,898
kWh
$11,679
-
kW-mo/yr
- - $(-201.0) $2,100