ITAC Assessment: BD0093
ITAC logo
ITAC Assessment: BD0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Film Laminate
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 91,950
ft2
Annual Production 382,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,358 12,459,848
kWh
Electricity Demand $327,335 21,927
kW-mo/yr
Electricity Fees $5,563 -
Natural Gas $111,081 40,141
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $122,799 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,865

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 2.4133: Use most efficient type of electric motors $16,718 $25,480 $9,901
283,705
kWh
$6,817
-
kW-mo/yr
- - - - - -
02 2.2437: Recover waste heat from equipment $4,952 $950 - - $4,952
-
MMBtu
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $1,421 $800 $952
27,257
kWh
$469
-
kW-mo/yr
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,147 $1,827 $467
13,482
kWh
$680
-
kW-mo/yr
- - - - - -
05 2.7491: Insulate glazing, walls, ceilings, and roofs $1,097 $2,773 $490
13,775
kWh
- $607
-
MMBtu
- - - - -
06 2.7135: Install occupancy sensors $727 $175 $305
8,792
kWh
$422
-
kW-mo/yr
- - - - - -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $48,604 $9,500 - - - - - - - $48,604
08 3.7191: Use water based spray abrasives instead of bar abrasives $1,183 $3,700 $(-600.0)
(-16,706)
kWh
- - $(-196.0)
-
gal
$2,259
-
gal
$(-280.0) - -
09 4.631: Install an uninteruptable power supply $45,000 $80,000 - - - - - - $45,000 -
10 4.452: Eliminate shift $1,950 - - - - - - - $1,950 -
TOTAL RECOMMENDED $122,799 $125,205 $11,515
330,305
kWh
$8,388
-
kW-mo/yr
$5,559
-
MMBtu
$(-196.0)
-
gal
$2,259
-
gal
$(-280.0) $46,950 $48,604
TOTAL IMPLEMENTED $17,865 $27,307 $10,368
297,187
kWh
$7,497
-
kW-mo/yr
- - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Other Liquid (haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs