ITAC Assessment: BD0092
ITAC logo
ITAC Assessment: BD0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Folding Cartons
NAICS
n/a
SIC 2657: Folding Paperboard Boxes, Including Sanitary
Sales Range $10
M
to 50
M
# of Employees 128
Plant Area 306,000
ft2
Annual Production 950,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,586 5,502,931
kWh
Electricity Demand $98,444 11,252
kW-mo/yr
Electricity Fees $20,173 -
Natural Gas $182,177 64,229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,624 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings Primary Product Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,927 $14,447 $7,641
174,385
kWh
$3,286
-
kW-mo/yr
- - - -
02 2.7135: Install occupancy sensors $10,209 $825 $7,579
188,746
kWh
$2,630
-
kW-mo/yr
- - - -
03 2.4133: Use most efficient type of electric motors $7,184 $7,202 $5,124
128,664
kWh
$2,060
-
kW-mo/yr
- - - -
04 2.1213: Direct warmest air to combustion intake $6,391 $9,400 - - $6,391
-
MMBtu
- - -
05 2.2511: Insulate bare equipment $2,553 $2,736 - - $2,553
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,041 $500 $806
20,223
kWh
$235
-
kW-mo/yr
- - - -
07 3.4151: Minimize water usage $799 $1,550 - - - $799
-
Tgal
- -
08 3.1191: Change procedures / equipment / operating conditions $502 $1,050 - - - - $502 -
09 4.122: Develop standard procedures to improve internal yields $50,018 - - - - - - $50,018
TOTAL RECOMMENDED $89,624 $37,710 $21,150
512,018
kWh
$8,211
-
kW-mo/yr
$8,944
-
MMBtu
$799
-
Tgal
$502 $50,018
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings Primary Product Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs