Assessment Year | 1997 |
---|---|
Principal Product | Oil Filter Components |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 85 |
Plant Area |
80,000
ft2
|
Annual Production | 10,000,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $79,791 | 1,363,716 |
kWh
|
$0.059 |
Electricity Demand | $11,833 | 4,643 |
kW-mo/yr
|
$2.55 |
Electricity Fees | $108 | - |
|
- |
Natural Gas | $21,709 | 4,491 |
MMBtu
|
$4.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,984 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,183 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $3,860 | $5,500 | - | - |
$3,860
-
MMBtu
|
- | - | - | - | |
02 | 2.7496: Install partitions to reduce size of conditioned space | $3,615 | $1,250 | - | - |
$3,615
-
MMBtu
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,151 | $1,151 |
$778
20,516
kWh
|
$373
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $867 | $325 |
$544
14,361
kWh
|
$323
-
kW-mo/yr
|
- | - | - | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $777 | - |
$777
20,516
kWh
|
- | - | - | - | - | - | |
06 | 2.7135: Install occupancy sensors | $668 | $525 |
$487
12,896
kWh
|
$181
-
kW-mo/yr
|
- | - | - | - | - | |
07 | 3.4115: Recover and reuse cooling water | $5,285 | $4,500 |
$(-271.0)
(-7,034)
kWh
|
$(-215.0)
-
kW-mo/yr
|
- |
$5,871
-
Tgal
|
- | $(-100.0) | - | |
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $1,881 | $500 | - | - | - | - |
$3,159
-
lb
|
$(-474.0) | $(-804.0) | |
09 | 4.452: Eliminate shift | $22,880 | $2,500 | - | - | - | - | - | $22,880 | - | |
TOTAL RECOMMENDED | $40,984 | $16,251 |
$2,315
61,255
kWh
|
$662
-
kW-mo/yr
|
$7,475
-
MMBtu
|
$5,871
-
Tgal
|
$3,159
-
lb
|
$22,306 | $(-804.0) | ||
TOTAL IMPLEMENTED | $30,183 | $8,476 |
$1,051
27,843
kWh
|
$481
-
kW-mo/yr
|
- |
$5,871
-
Tgal
|
- | $22,780 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs