ITAC Assessment: MI0367
ITAC logo
ITAC Assessment: MI0367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Aircraft Generators
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 185
Plant Area 94,000
ft2
Annual Production 1,300
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $134,182 2,738,560
kWh
Electricity Demand $160,110 12,707
kW-mo/yr
Electricity Fees $80,194 -
TOTAL YEARLY COSTS $374,486
RECOMMENDED SAVINGS* $99,256 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $69,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7221: Lower temperature during the winter season and vice-versa $38,331 $2,480 $21,850
445,909
kWh
$16,481
-
kW-mo/yr
02 2.3141: Use battery storage for demand control $21,335 $38,237 $11,961
244,096
kWh
$9,374
-
kW-mo/yr
03 2.7224: Reduce space conditioning during non-working hours $18,517 $2,480 $18,517
377,900
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $8,815 $120 $6,207
126,680
kWh
$2,608
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,479 $9,842 $1,828
37,303
kWh
$1,651
-
kW-mo/yr
06 2.7425: Clean or color roof to reduce solar load $3,241 $4,900 $2,397
48,925
kWh
$844
-
kW-mo/yr
07 2.4235: Remove or close off unneeded compressed air lines $3,190 $2,500 $2,245
45,818
kWh
$945
-
kW-mo/yr
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,348 $1,980 $1,655
33,769
kWh
$693
-
kW-mo/yr
TOTAL RECOMMENDED $99,256 $62,539 $66,660
1,360,400
kWh
$32,596
-
kW-mo/yr
TOTAL IMPLEMENTED $69,142 $14,922 $48,402
987,792
kWh
$20,740
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs