ITAC Assessment: BD0088
ITAC logo
ITAC Assessment: BD0088
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aerosol Cans
NAICS
n/a
SIC 3411: Metal Cans
Sales Range $10
M
to 50
M
# of Employees 56
Plant Area 120,000
ft2
Annual Production 98,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $137,436 3,286,929
kWh
Electricity Demand $71,568 7,558
kW-mo/yr
Electricity Fees $11,382 -
Natural Gas $50,090 14,192
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $19,848 $18,325 - - $19,848
-
MMBtu
- - - -
02 2.7135: Install occupancy sensors $3,946 $1,275 $2,550
65,651
kWh
$1,396
-
kW-mo/yr
- - - - -
03 2.4221: Install compressor air intakes in coolest locations $3,452 $500 $2,510
64,771
kWh
$942
-
kW-mo/yr
- - - - -
04 2.2511: Insulate bare equipment $1,892 $3,999 - - $1,892
-
MMBtu
- - - -
05 2.4133: Use most efficient type of electric motors $1,299 $2,750 $961
24,912
kWh
$338
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,229 $2,249 $705
18,171
kWh
$524
-
kW-mo/yr
- - - - -
07 3.1191: Change procedures / equipment / operating conditions $24,305 $1,900 - - - - $(-10,920.0) $(-2,882.0) $38,107
08 3.5212: Regrind, reuse, or sell scrap plastic parts $551 $290 - - - $551
-
lb
- - -
09 4.122: Develop standard procedures to improve internal yields $4,211 - - - - - - - $4,211
TOTAL RECOMMENDED $60,733 $31,288 $6,726
173,505
kWh
$3,200
-
kW-mo/yr
$21,740
-
MMBtu
$551
-
lb
$(-10,920.0) $(-2,882.0) $42,318
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs