| Assessment Year | 1997 |
|---|---|
| Principal Product | Rigid Foam Insulation |
| NAICS |
n/a
|
| SIC | 3296: Mineral Wool |
| Sales Range | $10 M to 50M |
| # of Employees | 48 |
| Plant Area |
146,142
ft2
|
| Annual Production | 145,000
units
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $62,094 | 2,112,544 |
kWh
|
$0.029 |
| Electricity Demand | $53,194 | 4,608 |
kW-mo/yr
|
$11.54 |
| Electricity Fees | $6,449 | - |
|
- |
| Natural Gas | $46,480 | 9,832 |
MMBtu
|
$4.73 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $30,820 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,319 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,667 | $6,050 |
$8,543
321,219
kWh
|
$4,233
-
kW-mo/yr
|
$(-6,109.0)
-
MMBtu
|
- | - | - | - | - | |
| 02 | 2.1123: Install automatic stack damper | $5,587 | $1,750 | - | - |
$5,587
-
MMBtu
|
- | - | - | - | - | |
| 03 | 2.4133: Use most efficient type of electric motors | $3,828 | $9,330 |
$2,066
70,340
kWh
|
$1,762
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $1,772 | $300 |
$878
29,894
kWh
|
$894
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 05 | 2.1213: Direct warmest air to combustion intake | $517 | $250 | - | - |
$517
-
MMBtu
|
- | - | - | - | - | |
| 06 | 2.7135: Install occupancy sensors | $745 | $975 |
$403
13,775
kWh
|
$342
-
kW-mo/yr
|
- | - | - | - | - | - | |
| 07 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $9,491 | $1,000 |
$(-8.0)
(-293)
kWh
|
- | - | - |
$7,452
-
lb
|
$(-2,048.0) | $4,095 | - | |
| 08 | 3.4151: Minimize water usage | $532 | $805 | - | - | - |
$532
-
Tgal
|
- | - | - | - | |
| 09 | 4.611: Begin a practice of predictive / preventative maintenance | $1,681 | $1,000 | - | - | - | - | - | - | - | $1,681 | |
| TOTAL RECOMMENDED | $30,820 | $21,460 |
$11,882
434,935
kWh
|
$7,231
-
kW-mo/yr
|
$(-5.0)
-
MMBtu
|
$532
-
Tgal
|
$7,452
-
lb
|
$(-2,048.0) | $4,095 | $1,681 | ||
| TOTAL IMPLEMENTED | $13,319 | $10,330 |
$2,058
70,047
kWh
|
$1,762
-
kW-mo/yr
|
- | - |
$7,452
-
lb
|
$(-2,048.0) | $4,095 | - | ||