ITAC Assessment: BD0082
ITAC logo
ITAC Assessment: BD0082
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Truck Bumpers and Chassis Stampings
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 140
Plant Area 108,000
ft2
Annual Production 12,860
ton
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $127,648 3,008,499
kWh
Electricity Demand $88,232 7,244
kW-mo/yr
Electricity Fees $5,248 -
Natural Gas $65,741 21,481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $220,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $33,074

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
01 2.2437: Recover waste heat from equipment $6,539 $2,500 - - $6,539
-
MMBtu
- - - - - -
02 2.4133: Use most efficient type of electric motors $4,024 $8,880 $2,844
67,116
kWh
$1,180
-
kW-mo/yr
- - - - - - -
03 2.7135: Install occupancy sensors $1,748 $1,125 $1,497
35,463
kWh
$251
-
kW-mo/yr
- - - - - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $959 $553 $959
22,567
kWh
- - - - - - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $903 $1,011 $531
12,603
kWh
$372
-
kW-mo/yr
- - - - - - -
06 2.4221: Install compressor air intakes in coolest locations $793 $500 $443
10,551
kWh
$350
-
kW-mo/yr
- - - - - - -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $149,301 $90,400 - - - - $8,633
-
gal
$26,981
-
lb
- $99,741 $13,946
08 3.3122: Use filtration, centrifuging to remove contaminants $31,643 $34,000 $(-1,195.0)
(-10,844)
kWh
- - $34,840
-
Tgal
- - $(-702.0) - $(-1,300.0)
09 3.5316: Contract a wood pallet recycling company $3,344 $420 - - - - - - - - $3,344
10 4.122: Develop standard procedures to improve internal yields $20,759 $1,800 - - - - - - $20,759 - -
TOTAL RECOMMENDED $220,013 $141,189 $5,079
137,456
kWh
$2,153
-
kW-mo/yr
$6,539
-
MMBtu
$34,840
-
Tgal
$8,633
-
gal
$26,981
-
lb
$20,057 $99,741 $15,990
TOTAL IMPLEMENTED $33,074 $14,233 $4,246
100,234
kWh
$1,530
-
kW-mo/yr
$6,539
-
MMBtu
- - - $20,759 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Primary Raw Material Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs