ITAC Assessment: BD0080
ITAC logo
ITAC Assessment: BD0080
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Metal Stampings
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 87,000
ft2
Annual Production 1,196,000
ton
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,512 705,451
kWh
Electricity Demand $47,337 3,881
kW-mo/yr
Electricity Fees $3,133 -
Natural Gas $12,857 3,252
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $145,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $3,382 $8,810 $1,396
42,204
kWh
$1,986
-
kW-mo/yr
- - - - - - -
02 2.8112: Combine utility meters $2,671 $100 - - $2,671 - - - - - -
03 2.2437: Recover waste heat from equipment $2,361 $1,000 - - - $2,361
-
MMBtu
- - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,034 $3,504 $730
21,981
kWh
$1,304
-
kW-mo/yr
- - - - - - -
05 2.4221: Install compressor air intakes in coolest locations $901 $800 $354
10,551
kWh
$547
-
kW-mo/yr
- - - - - - -
06 2.7135: Install occupancy sensors $703 $900 $279
8,499
kWh
$424
-
kW-mo/yr
- - - - - - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $422 $450 $422
12,603
kWh
- - - - - - - -
08 3.8124: Install floating covers on tanks of volatile materials to reduce evaporation $2,430 $400 - - - - - $2,430 - - -
09 3.4151: Minimize water usage $469 $1,265 - - - - - - $469
-
Tgal
- -
10 4.441: Install automatic packing equipment $118,560 $19,000 - - - - $118,560 - - - -
11 4.611: Begin a practice of predictive / preventative maintenance $11,712 $3,000 - - - - $(-3,888.0) - - $12,600 $3,000
TOTAL RECOMMENDED $145,645 $39,229 $3,181
95,838
kWh
$4,261
-
kW-mo/yr
$2,671 $2,361
-
MMBtu
$114,672 $2,430 $469
-
Tgal
$12,600 $3,000
TOTAL IMPLEMENTED $17,301 $8,254 $1,431
43,083
kWh
$1,728
-
kW-mo/yr
- - $(-3,888.0) $2,430 - $12,600 $3,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs