ITAC Assessment: BD0079
ITAC logo
ITAC Assessment: BD0079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Sheet Metal Components
NAICS
n/a
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 185
Plant Area 78,750
ft2
Annual Production 6,700,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $116,434 2,287,515
kWh
Electricity Demand $13,133 5,579
kW-mo/yr
Electricity Fees $859 -
Natural Gas $95,973 25,148
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $222,452 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.6218: Turn off equipment when not in use $2,763 - n/a $2,763
75,615
kWh
- - - - - - - -
02 2.4221: Install compressor air intakes in coolest locations $2,201 $500 n/a $1,647
45,135
kWh
$554
-
kW-mo/yr
- - - - - - -
03 2.7135: Install occupancy sensors $1,702 $1,200 n/a $1,009
27,550
kWh
$693
-
kW-mo/yr
- - - - - - -
04 2.7491: Insulate glazing, walls, ceilings, and roofs $816 $1,460 n/a $816
63,599
kWh
- - - - - - - -
05 3.2123: Convert to high volume low pressure (hvlp) paint guns $153,684 $8,100 n/a - - - - - - - $153,684 -
06 3.3125: Use distillation, evaporation to remove contaminants $16,271 $20,500 n/a - - $(-2,921.0) - $9,742
-
gal
- - $9,450 -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $7,252 $7,000 n/a - - - - - $3,110
-
lb
$(-1,456.0) $5,598 -
08 3.4151: Minimize water usage $713 $1,625 n/a - - - $281
-
Tgal
- - - - $432
-
Tgal
09 4.111: Add equipment/ operators to reduce production bottleneck $37,050 $9,400 n/a - - - - - - $37,050 - -
TOTAL RECOMMENDED $222,452 $49,785 $6,235
211,899
kWh
$1,247
-
kW-mo/yr
$(-2,921.0) $281
-
Tgal
$9,742
-
gal
$3,110
-
lb
$35,594 $168,732 $432
-
Tgal
TOTAL IMPLEMENTED - - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs