ITAC Assessment: BD0077
ITAC logo
ITAC Assessment: BD0077
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Display Fixtures
NAICS
n/a
SIC 2541: Wood Office and Store Fixtures, Partitions, Shelving, and Lockers
Sales Range $50
M
to 100
M
# of Employees 230
Plant Area 320,000
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,964 3,809,496
kWh
Electricity Demand $120,607 12,409
kW-mo/yr
Electricity Fees $3,338 -
Natural Gas $158,407 28,249
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $163,081 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,073

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $13,704 $4,000 - - $13,704
-
MMBtu
- - - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,964 $10,588 $3,888
149,766
kWh
$3,076
-
kW-mo/yr
- - - - - -
03 2.7135: Install occupancy sensors $2,534 $2,745 $1,920
72,098
kWh
$614
-
kW-mo/yr
- - - - - -
04 2.4133: Use most efficient type of electric motors $2,692 $6,230 $1,739
67,702
kWh
$953
-
kW-mo/yr
- - - - - -
05 2.4226: Use / purchase optimum sized compressor $1,892 $2,500 $1,892
94,666
kWh
- - - - - - -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $67,324 $16,500 - - - - - $67,324 - -
07 3.1192: Reduce scrap production $46,525 $4,500 - - - $10,333
-
gal
$36,192 - - -
08 3.4151: Minimize water usage $1,091 $2,250 - - - - - - $1,091
-
Tgal
-
09 4.423: Move product using mechanical means $20,355 - - - - - - - - $20,355
TOTAL RECOMMENDED $163,081 $49,313 $9,439
384,232
kWh
$4,643
-
kW-mo/yr
$13,704
-
MMBtu
$10,333
-
gal
$36,192 $67,324 $1,091
-
Tgal
$20,355
TOTAL IMPLEMENTED $58,073 $23,818 $7,519
312,134
kWh
$4,029
-
kW-mo/yr
- $10,333
-
gal
$36,192 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Primary Raw Material Savings Ancillary Material Cost Savings Water Consumption Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs