ITAC Assessment: UL0240
ITAC logo
ITAC Assessment: UL0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Injection Molded Plastics
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 65,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $113,715 2,805,979
kWh
Electricity Demand $33,402 7,033
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,437 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (haz) Savings One-time Revenue or Avoided Cost Savings
01 2.7124: Make a practice of turning off lights when not needed $2,535 - $2,535
62,600
kWh
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,065 $20 $917
22,567
kWh
$148
-
kW-mo/yr
- -
03 3.7198: Reduce / eliminate use of disposable product $1,113 $700 - - $1,113
-
lb
-
04 4.515: Install shelves / racks to utilize unused space $2,314 $4,150 - - - $2,314
05 4.514: Re-arrange equipment layout to reduce handling costs $1,410 $384 - - - $1,410
TOTAL RECOMMENDED $8,437 $5,254 $3,452
85,167
kWh
$148
-
kW-mo/yr
$1,113
-
lb
$3,724
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs