ITAC Assessment: BD0073
ITAC logo
ITAC Assessment: BD0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Truck Bodies
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 43
Plant Area 48,500
ft2
Annual Production 1,300
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $15,532 344,080
kWh
Electricity Demand $20,218 1,662
kW-mo/yr
Electricity Fees $374 -
Natural Gas $13,614 3,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,251 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $2,206 $3,779 n/a - - $2,206
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,491 $850 n/a $1,491
33,118
kWh
- - -
03 2.7135: Install occupancy sensors $643 $600 n/a $302
6,741
kWh
$341
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $527 $1,410 n/a - $527
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $498 $500 n/a $218
4,982
kWh
$280
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $216 $337 n/a $92
2,052
kWh
$124
-
kW-mo/yr
- -
07 3.2123: Convert to high volume low pressure (hvlp) paint guns $14,670 $2,700 n/a - - - $14,670
TOTAL RECOMMENDED $20,251 $10,176 $2,103
46,893
kWh
$1,272
-
kW-mo/yr
$2,206
-
MMBtu
$14,670
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs