ITAC Assessment: MS0236
ITAC logo
ITAC Assessment: MS0236
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fabricated Steel Structures
NAICS 332312: Fabricated Structural Metal Manufacturing
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 360,000
ft2
Annual Production 25,000
ton
Production Hrs. Annual 7,280
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $138,520 2,850,800
kWh
Electricity Demand $36,702 11,119
kW-mo/yr
Electricity Fees $31,617 -
Natural Gas $28,688 2,983
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $23,086 $36,955 n/a $15,279
336,791
kWh
$2,574
-
kW-mo/yr
$5,233
02 2.7134: Use photocell controls $2,939 $778 n/a $2,275
50,148
kWh
- $664
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,626 $178 n/a $2,032
44,792
kWh
- $594
04 2.4239: Eliminate or reduce compressed air usage $1,290 $371 n/a $998
22,013
kWh
- $292
TOTAL RECOMMENDED $29,941 $38,282 $20,584
453,744
kWh
$2,574
-
kW-mo/yr
$6,783
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs