Assessment Year | 1996 |
---|---|
Principal Product | Industrial Materials Handling Products |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $5 M to 10M |
# of Employees | 80 |
Plant Area |
53,000
ft2
|
Annual Production | 15,000
pieces
|
Production Hrs. Annual | 4,992
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $44,191 | 1,150,352 |
kWh
|
$0.038 |
Electricity Demand | $40,590 | 3,342 |
kW-mo/yr
|
$12.15 |
Electricity Fees | $516 | - |
|
- |
Natural Gas | $31,998 | 8,708 |
MMBtu
|
$3.67 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,538 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $27,677 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,520 | $6,730 |
$2,484
70,926
kWh
|
$1,036
-
kW-mo/yr
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $1,343 | $800 |
$643
18,464
kWh
|
$700
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,298 | $1,975 |
$675
19,343
kWh
|
$623
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,259 | $600 |
$1,259
36,049
kWh
|
- | - | |
05 | 2.7135: Install occupancy sensors | $518 | $675 |
$247
7,034
kWh
|
$271
-
kW-mo/yr
|
- | |
06 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $21,600 | $3,100 | - | - | $21,600 | |
TOTAL RECOMMENDED | $29,538 | $13,880 |
$5,308
151,816
kWh
|
$2,630
-
kW-mo/yr
|
$21,600 | ||
TOTAL IMPLEMENTED | $27,677 | $12,405 |
$4,418
126,318
kWh
|
$1,659
-
kW-mo/yr
|
$21,600 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs