ITAC Assessment: BD0063
ITAC logo
ITAC Assessment: BD0063
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Ceramics
NAICS
n/a
SIC 3297: Nonclay Refractories
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 112,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $73,237 1,881,887
kWh
Electricity Demand $53,187 4,375
kW-mo/yr
Electricity Fees $4,700 -
Natural Gas $391,078 141,269
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,122 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,054

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
01 2.7135: Install occupancy sensors $9,836 $5,400 $5,437
163,834
kWh
$4,399
-
kW-mo/yr
- - -
02 2.8112: Combine utility meters $5,724 $100 - - - $5,724 -
03 2.4133: Use most efficient type of electric motors $4,541 $8,390 $3,300
99,355
kWh
$1,241
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,677 $750 $1,677
50,410
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $833 $600 $833
25,205
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $421 $903 $158
4,689
kWh
$263
-
kW-mo/yr
- - -
07 3.4151: Minimize water usage $1,090 $1,395 - - $469
-
Tgal
- $621
-
Tgal
TOTAL RECOMMENDED $24,122 $17,538 $11,405
343,493
kWh
$5,903
-
kW-mo/yr
$469
-
Tgal
$5,724 $621
-
Tgal
TOTAL IMPLEMENTED $16,054 $14,540 $10,414
313,599
kWh
$5,640
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs