Assessment Year | 1996 |
---|---|
Principal Product | Ceramics |
NAICS |
n/a
|
SIC | 3297: Nonclay Refractories |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
112,000
ft2
|
Annual Production | 14,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $73,237 | 1,881,887 |
kWh
|
$0.039 |
Electricity Demand | $53,187 | 4,375 |
kW-mo/yr
|
$12.16 |
Electricity Fees | $4,700 | - |
|
- |
Natural Gas | $391,078 | 141,269 |
MMBtu
|
$2.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $24,122 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,054 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7135: Install occupancy sensors | $9,836 | $5,400 |
$5,437
163,834
kWh
|
$4,399
-
kW-mo/yr
|
- | - | - | |
02 | 2.8112: Combine utility meters | $5,724 | $100 | - | - | - | $5,724 | - | |
03 | 2.4133: Use most efficient type of electric motors | $4,541 | $8,390 |
$3,300
99,355
kWh
|
$1,241
-
kW-mo/yr
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,677 | $750 |
$1,677
50,410
kWh
|
- | - | - | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $833 | $600 |
$833
25,205
kWh
|
- | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $421 | $903 |
$158
4,689
kWh
|
$263
-
kW-mo/yr
|
- | - | - | |
07 | 3.4151: Minimize water usage | $1,090 | $1,395 | - | - |
$469
-
Tgal
|
- |
$621
-
Tgal
|
|
TOTAL RECOMMENDED | $24,122 | $17,538 |
$11,405
343,493
kWh
|
$5,903
-
kW-mo/yr
|
$469
-
Tgal
|
$5,724 |
$621
-
Tgal
|
||
TOTAL IMPLEMENTED | $16,054 | $14,540 |
$10,414
313,599
kWh
|
$5,640
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs