ITAC Assessment: BD0054
ITAC logo
ITAC Assessment: BD0054
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Garage Door Openers
NAICS
n/a
SIC 3442: Metal Doors, Sash, Frames, Molding, and Trim Manufacturing
Sales Range $5
M
to 10
M
# of Employees 146
Plant Area 118,000
ft2
Annual Production 48,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,891 937,573
kWh
Electricity Demand $42,746 3,476
kW-mo/yr
Electricity Fees $5,811 -
Natural Gas $25,460 10,030
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,087 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,794

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,693 $8,316 $1,243
38,980
kWh
$2,450
-
kW-mo/yr
- - - - -
02 2.4226: Use / purchase optimum sized compressor $3,441 $8,447 $406
12,603
kWh
$1,064
-
kW-mo/yr
- $1,674 - - $297
-
Tgal
03 2.4133: Use most efficient type of electric motors $1,101 $4,220 $443
13,775
kWh
$658
-
kW-mo/yr
- - - - -
04 2.7135: Install occupancy sensors $487 $675 $168
5,275
kWh
$319
-
kW-mo/yr
- - - - -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $7,212 $500 - - $2,340
-
lb
$(-1,000.0) - $5,872 -
06 3.2123: Convert to high volume low pressure (hvlp) paint guns $1,153 $650 - - - - $(-300.0) $1,453 -
TOTAL RECOMMENDED $17,087 $22,808 $2,260
70,633
kWh
$4,491
-
kW-mo/yr
$2,340
-
lb
$674 $(-300.0) $7,325 $297
-
Tgal
TOTAL IMPLEMENTED $4,794 $12,536 $1,686
52,755
kWh
$3,108
-
kW-mo/yr
- - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs